Installation and start-up of KEOR HPE UPS 200 kVA
Installazione e avviamento KEOR HPE UPS 200 kVA
40
OMP06144 REV. A
1)
Close the rectifier input switch RCB. After some seconds the
touch screen
will start and
will show the UPS mimic diagram.
Picture 10 – UPS start-up page
2)
After the software loading phase the control logic will acquire the system status and the
operation of the RCB switch, and will show the operating sequences.
Picture 11 – Rectifier start-up