HP-4 Wet Location Surface Mount Installation Instructions
5 of 9
© 2019 FINELITE, INC. ALL RIGHTS RESERVED. Form - 98439. V2 EFFECTIVE DA
TE: 09/09/19
CONTINUED
Step 4 - Mounting Starter to Structure
A. Make Electrical Connections
Sealing O-Ring
(provided)
Wire-nut electrical
connections.
WIRING LEGEND
Black
Hot
Line Voltage
White
Neutral Line Voltage
Green
Ground
Grey
Dimming
0-10V DC
Purple
Dimming
0-10V DC
•
Install conduit, sealing o-ring, and nylon nut onto the luminaire.
•
Wire-nut electrical connections. See wiring legend above.
Flex Conduit
(by others)
Nylon Nut
(provided)
Ceiling
Nylon Nut
(provided)
•
CRITICAL: If luminaire contains a sensor, refer to Sensor Addendum before mounting starter to structure.
•
While properly supporting luminaire, maneuver luminaire near wall/ceiling.
•
Make electrical connections at TOP of luminaire.
Sealing O-Ring
(provided)
Starter
Nylon Nut
(provided)
Sealing O-Ring
(provided)
0-10V
Dimming