Keor MOD
13
EN
2. Installation procedure
2.1
Step 1
Remove the UPS cabinet from the pallet by following the unpackaging instructions in the installation manual.
Do not proceed with step 2 until the unpackaging has been completed.
2.2
Step 2
Install the lateral mounts (A) to the ground keeping them aligned and with each other.
Use 6 (3+3) M16 certified seismic fasteners to install the subassemblies, following the indications provided by the supplier.
Install the lateral mounts in the final placement of the unit.
Torquing moment for M16 provided by seismic anchor producer.
a3
A
Summary of Contents for 3 111 19
Page 43: ...Keor MOD 43 FR EN IT DE ES ...