Keor MOD
17
EN
2.6
Step 6 (only for 3 111 19)
Only for the 3 111 19 (Keor MOD 125 kVA), in addition to the seismic basement, there are also ten metal bars and
twenty M4x8 screws to keep stable the battery packs in the drawers. For each battery drawer, after having followed
the instructions in the Keor MOD installation manual to install the battery packs, mount a metal bar with two relative
screws as shown in the picture:
Summary of Contents for 3 111 19
Page 43: ...Keor MOD 43 FR EN IT DE ES ...