
3
5
Bearing Pos. 25 + 26 in the nozzle body
Insert bearing ring 5TC.000.C9.26.R0.0 (pos. 26) and ball bearing 5TC.000.2R.26.BR.1
(pos. 25).
Bearing on shaft Pos. 4
Insert bearing consisting of 2 x bearing ring 5TM.000.C9.26.R0.0 (pos. 6) and 58 x ball
5TM.000.R6.4V.R0.0 (pos. 5)
Attention: Make sure that the shaft (pos. 4) rests on a straight and firm surface. The
shaft should not be lifted or moved after the bearing has been mounted, otherwise
the ball bearing with the 58 balls may come loose.