
1
1
MAINTENANCE 1
It is recommended to perform
Maintenance 1 every 500 operating hours.
For this purpose, utilize
Spare parts package 1
, consisting of:
Spare parts package 1
Pos.
spare
parts list
Description
Quantity Product number
Ordering number
2
Cylinder head screw
3/16“ x 3/4“, for
following connections:
AS, BS, AW
6 pieces 5TC.000.1C.02.FS.0
5TM.000.00.SP.02.1
2
Cylinder head screw
3/16“ x 1/2“, for
following connections:
AN, AM, AR, BR, SP
6 pieces 5TC.000.1C.02.FR.0
15
Cylinder head screw
3/16“ x 1/2“
9 pieces 5TC.000.1C.02.FR.0
16
Washer
1 piece
5TC.000.1Y.19.00.0
19
Hexagon head screw
3/16“ x 1/2“
4 pieces 5TC.000.1C.21.H0.0
32
Bearing
1 piece
5TM.000.T7.29.C0.0
The following steps, (described in more
detail later in this manual), are necessary
for Maintenance 1:
Disassembly:
Cover pos. 35
Cover Pos. 34
Info bearing Pos. 32
Connection piece Pos. 1
Bearing pos. 32 - for shaft pos. 9
Inspection
Assembly:
Bearing pos. 32 for shaft pos. 9
Cover pos. 34
Connector
Cover Pos. 35