LEADER Half Pint Evaporator
Year: 2014
Page: 12
2.
Cut bricks for the locations as labeled:
a.
FW1 – full brick cut to 4” x 4 ½” (4 needed)
b.
FW2 – half brick cut to 4” X 4 ½”
c.
Cut one half brick in half (results in 2 pcs 4 ½” X 4 ½”) (HHB)
d.
Cut one full brick in half (results in 2 pcs 4 ½” X 4 ½ “) (HFB)
3.
Place a pencil mark 8 ½” in front of the face of the back wall brick. This is the front of the firewall.
4.
Place bricks in the arch as illustrated. The bricks are laid with the 4 ½” side down. Only the surfaces of the brick
where they face another brick need to be coated with cement.
5.
Fill all edges and gaps with cement.
SETTING THE PANS
1.
Place the boiling pan on the arch so the pan rests between the corner brackets of the arch.
2.
Place the reservoir pan to the front of the arch with the connectors towards the front of the arch.
3.
Wrap both ends of the ½” stainless steel nipple (supplied) with Teflon tape.
4.
Screw the supplied brass lead free ball valve onto one end of the stainless steel nipple. The assembly is referred
to as the reservoir pan faucet.
INSTALLING THE DRAW OFF VALVES
It is recommended two ½” stainless steel ball valves (LEADER Order # 60100) and 2 ½” stainless steel close nipples
(LEADER Order # 72101) be installed. Other options are available. Contact LEADER Customer Service or your local
dealer.
1.
Remove the threaded plug(s) from the couplers located on each side
of the boiling pan.
5.
Locate the front draw off of the boiling pan.
6.
Connect the reservoir pan faucet to the connector on the
reservoir pan that is on the same side as the front draw off
of the boiling pan. Ex. if the boiling pan draw off is on the
right side, screw the reservoir pan faucet into the right
side connector of the reservoir pan.
7.
Place the reservoir pan 6” from the front of the boiling
pan.
8.
You will need to add a draw off valve to the boiling pan
draw off connectors (2 needed). Contact LEADER
EVAPORATOR Customer Service or your local dealer for
options and costs