background image

Page 4

v.06.18.20

LDPI, Inc.   |   (800)-854-0021   |   www.ldpi-inc.com   |   [email protected]

INSTALLATION INSTRUCTIONS

LEHL2

Installation: Mechanical Connection

Expansion bolts

( Washers required ) M10

Soket head cap screw M5

Soket head cap screw M10

3/4’’ NPT

Angle 0-90° Adjustable

1. Ceiling

2. Bracket

 

 

Step 1

Step 2

Step 3

Figure 1a

Expansion bolts

(Washers required ) M10

3/4’’ NPT

Step 1

Step 2

Step 3

Step 1:

   Mark and drill desired location on mounting surface.  Secure the driver housing cover with (4) M10 expansion bolts

   (not provided) directly to a structural member.  Thread onto a 3/4” NPT conduit.

Step 2:

  Hang the fixture onto the hinged hook of the driver housing cover.  Connect supply wires to luminaire wire leads (or

  Wago connectors provided).

Step 3:

  Close driver housing, making sure that all wires are safely tucked inside housing.  Tighten (3) M6 captive closing

  screws to 6 N-m.  Ensure NPT fittings are water tight to prevent water leakage.

Step 1:

  Secure the bracket and driver housing cover with (4) M10 expansion bolts (not provided) directly to a structural member, make

  sure the hinge is located as marked (See Figure 1a). Adjust the angle of the bracket (6x15°) and fix the position with M5

  screws (provided).

Step 2:

  Hang the fixture onto the hinged hook of the driver housing cover.  Connect supply wires to luminaire wire leads (or

  Wago connectors provided).

Step 3:

  Close driver housing, making sure that all wires are safely tucked inside housing.  Tighten (3) M6 captive closing

  screws to 6 N-m.  Ensure NPT fittings are water tight to prevent water leakage.

Summary of Contents for LEHL2 Series

Page 1: ...re voltage Do not install in a location where the marked operating temperatures exceed the ignition temperatures of the hazardous atmosphere Do not operate in ambient temperatures above those indicated on the luminaire nameplate All gasket seals must be clean and undamaged Turn off electrical power at fuse or circuit breaker box before wiring luminaire to the power supply Turn off the power when a...

Page 2: ...2 Power Wattage L1 80W L2 120W L3 150W L4 200W 3 Voltage VAC V1 100 277VAC V2 347 480VAC 4 LED Color Temperature K 3 3 000K 4 4 000K 5 5 000K 57 5 700K 65 6 500K RD Red GN Green BU Blue AM Amber 5 Optics Beam T1 Type I LED Diffuser T3 Type III LED Diffuser T5 110 No Diffuser 6 Lens Type C Clear Glass D Diffused Glass DL Drop Lens Glass CP Clear Poly DP Diffused Poly PDL Poly Drop Lens 7 Mount Type...

Page 3: ...supply wires to luminaire wire leads or Wago connectors provided Step 3 Close driver housing making sure that all wires are safely tucked inside housing Tighten 3 M6 captive closing screws to 6 N m Ensure NPT fittings are water tight to prevent water leakage Step 1 Secure the bracket and driver housing cover with 4 M10 expansion bolts not provided directly to a structural member make sure the hing...

Page 4: ...ure adapter gaskets is properly seated in the groove Step 3 Hang the entire fixture onto the adapter Align as marked on the housing Step 4 Rotate the fixture clockwise and secure to the adapter with 5 M5 screws provided and torque to 5 N m Step 5 Unscrew the driver cover housing hood and connect supply wires to luminaire wire leads or Wago connectors Step 6 Close driver housing ensuring all wiring...

Page 5: ...n Ground Yellow 10V output LED Driver Lead wires to LED load Terminal Block Black Green White 1 Loosen 8 M6 hex bolts of driver housing at torque value 6 N m 2 Connect the housing to suitable conduit 3 4 NPT 3 Insert outside wires through conduit and the entry hole of the housing and connect to terminal block 4 Introduce the wires of the branch circuit as following Black Connect to line White Conn...

Page 6: ...river housing making sure that all wires are safely tucked inside housing Tighten 3 M6 captive closing screws to 6 N m Ensure NPT fittings are water tight to prevent water leakage Step 3 Rotate the fixture clockwise and secure the adapter with 5 M5 screws provided and torque to 5 N m Step 4 Unscrew the hood and connect supply wires to luminaire wire leads or Wago connectors Step 5 Close driver hou...

Page 7: ...f our LED lighting luminaire the Product s that are purchased while this Warranty is in effect will be free from defects in materials and workmanship for the period of time specified in the table below the Warranty Period The Warranty Period runs from the date of original purchase from its authorized distributor dealer We will repair or at our option replace the defective product exterior finish h...

Reviews: