![LAVAZZA LB2317 Operation And Maintenance Download Page 34](http://html.mh-extra.com/html/lavazza/lb2317/lb2317_operation-and-maintenance_680651034.webp)
English
7
34
7.7.1
At First Start-up
Press the power button on the back of the machine to
turn it on. The control panel display shows the wording
"SYSTEM BOOT". Then you are requested to press a
button.
Once you have pressed a button the control panel display
shows the wording "Start water circuit priming?". The
"Espresso" button is steady on.
Press the espresso button and the machine starts priming
the circuit. The following screen is displayed:
It will then carry out the warm-up and rinse cycle as
described in section "Warm-up and Rinsing".
7.7.2
After a Period of Inactivity
Empty the water tank, wash and rinse it and fill it with
fresh water (see section "Filling the Water Tank"). Place a
large container under the coffee dispensing spout.
Open and close the capsule loading tray and press the
"Caffè Crema" button - with no capsule inserted - to start
brewing. The machine starts brewing coffee from the
dispensing spout. Wait until brewing has been completed
and empty the container. Repeat the brewing cycles 3
times, opening and closing the capsule loading tray each
time. Place a container under the hot water dispensing
spout.
Press the "Hot Water" button. The machine starts
dispensing hot water. Then it stops automatically.
Continue dispensing water until the no water icon is
displayed.
Summary of Contents for LB2317
Page 88: ...Cod 15005110 Ed 00 ...