Launch TLT245AT / TLT250AT(C) Two-post lift’s Installation manual
5
2.2 Principles of equipment
z
Lifting mechanism: Each of the two columns
has one hydraulic cylinder respectively. When
the power unit works, the hydraulic oil gets into
the lower chamber of the cylinder, forcing the
piston rod moves upward and drive the
carriage moving upward .
z
Supporting mechanism: When the vehicle
enters into the working area, adjust the
position of two-stage telescopic swing arms to
make the lifting pad near the correct lifting
point of the vehicle, and then adjust the screw
height below the pad to adapt to different
heights of vehicle chassis.
z
Balancing mechanism: To keep the balance
during the lifting and lowering process, the lift
uses two steel cables to interconnect two
carriages, forcing the carriages to rise and
descend synchronously. If the carriages and
swing arms are not on the same level, adjust
the screw at the end of the steel cable, making
the swing arms at the same level (equal
position from the floor). At this time, the steel
cables must be adjusted tightly with equal
tension, otherwise the equalization can’t be
ensured.
z
Manual safety lock system: Two safety plates
are installed on each of the column and safety
boards are welded on the back of the carriages.
When the carriages rise, safety boards will go
up and push against the safety plates .When
the carriages stop, the safety plates will get
into the slot of the safety boards to prevent the
carriages from lowering; when lowering the
carriage, lift carriages a little to disengage
safety plate and then pull the lowering handle
on power unit to lower the carriages
z
Safety lock scope: The effective travel range of
safety lock mechanism is from 470mm to
1900mm,the distance between the lifting pad
and ground.
z
To prevent the vehicle slip, the swing arm is
installed with positioning mechanism, making
the swing arm capable of automatic locking
during operation.
3. Tools for installation and adjustment
To ensure proper installation and adjustment, please prepare the following tools:
Tool Model
Leveling instrument
Carpentry type
Chalk line
Min 4.5m
Taper Plunger Chip
Hammer 1.5kg
Tweezer Small
type
Crescent wrench
40mm
Open-end wrench set
11mm-23mm
Ratchet socket set
Flat screwdriver
150mm
Rotary hammer drill
20mm
Concrete drill-bit
4 feet bubble level
Summary of Contents for TLT245AT
Page 19: ......
Page 37: ...Launch TLT245AT TLT250AT C Two post lift s Installation manual 16...
Page 38: ...Launch TLT245AT TLT250AT C Two post lift s Installation manual 17 225 2 24 226 227 228 229 229...
Page 44: ...Launch TLT245AT TLT250AT C Two post lift s Installation manual 23...
Page 54: ......