Launch TLT245AT / TLT250AT(C) Two-post lift’s Installation manual
10
Diagram of column, extension column and top beam
8-M12×35 Hex bolt
16-12 flat washer
8-M12 nut
8-12 spring washer
6-M10×20 Hex bolt
6-10 flat washer
6-10 spring washer
Top pulley
2
1
1″
2″
Column
16-M12×35 Hex bolt
32-12 flat washer
16-12 spring washer
Extension column
16-M12 nut
Connection
bracket
Fig 8
5.2.5 Install the offside column
Install the offside column as the procedures in5.2.3
.
5.2.6 Install and adjust the balancing steel
cables
Raise the two carriages to the safety locking position
and two carriages are of the same height from the floor.
Install the two steel cables as shown in Fig. 9.
Adjust the tension of cables through the adjustment nuts on
each end of steel cable. The steel cables should be tight in
equal tension. Each steel cable should be ensured in the
pulley when adjusting tightly, otherwise the steel cable will
be damaged.
Note
:
Before operating the lift, recheck to
balancing steel cables and ensure they are not
intersected or wrongly installed. Ensure that the
steel ropes are still on the pulley.
Summary of Contents for TLT245AT
Page 19: ......
Page 37: ...Launch TLT245AT TLT250AT C Two post lift s Installation manual 16...
Page 38: ...Launch TLT245AT TLT250AT C Two post lift s Installation manual 17 225 2 24 226 227 228 229 229...
Page 44: ...Launch TLT245AT TLT250AT C Two post lift s Installation manual 23...
Page 54: ......