Alpha
22
Preparations
June 20, 2018/ YACE0092
6.2
Filling and Emptying
Filling
Close the drain nozzle.
Fill baths up to a maximum level of 20 mm
below the bath bridge.
Optimum operation at 20
– 40 mm below
the bath bridge.
Operation is possible down to 70 mm
below the bath bridge.
Low-level cut at about 80 mm below the
bath bridge!
(Protection testing (
Emptying
Switch off the thermostat, pull out the mains plug!
Drain the heat transfer liquid through the drain nozzle
using a flexible tube.
The units are designed for operation with non-flammable liquids to
DIN EN 61010-2-010
water or glycol/ water mixture.
When starting up the unit, the tubular heater has to be covered with liquid!
When connecting an external consumer take care of the heat transfer liquid level for
it must not decrease too much
fill in heat transfer liquid if necessary.
Do not drain the heat transfer liquid when it is hot or very cold (below 0 °C)!
Bath drain nozzle
Summary of Contents for Alpha A
Page 1: ...2SHUDWLQJ LQVWUXFWLRQV LAUDA Alpha HDWLQJ DQG FRROLQJ WKHUPRVWDWV...
Page 2: ......
Page 4: ......
Page 15: ...Alpha June 20 2018 YACE0092 Control and functional elements 15 A 6 A 12 A 24 RA 8 RA 12 RA 24...
Page 48: ...Alpha 48 June 20 2018 YACE0092 intentionally left blank...
Page 50: ......
Page 51: ......