ASSEMBLY
9D990-2401
2-7
Point Installation
NOTE
When replacing or reversing point, change ALL points at
the same time so that they will have the same operating
depth. If some shanks have worn points and some have
new points, or points of a different design, the chisel plow
will not operate efficiently.
Chisel Plow Point
Install a Chisel Plow Point to each Shank with 1/2-13 x 3
Plow Bolts and Flanged Locknuts.
Figure 2-8: Chisel Plow Point
Twisted Shovels
Install a LH or RH Twisted Shovel per
to
each Shank with 7/16-14 x 2-1/2 Special Plow Bolts and
Flanged Lock Nuts.
LH means that the
soil is thrown left and RH means that the soil is thrown
right. If another arrangement is desired, be sure that the
shovels have balanced positions from right side to left
side. An example of this would be a LH shovel is the same
distance from the center of the machine as a RH shovel is
on the opposite side.
Figure 2-9: Twisted Shovels
Plow Bolt,
1/2-13 x 3
Chisel Point
Flanged
Locknut,1/2-13
Bolt,7/16-14 x 2-1/2
Twisted Shovel,
Right Hand
Twisted Shovel,
Left Hand
Bolt,7/16-14 x 2-1/2
Special Plow
Special Plow
Flanged
Locknut,7/16-14
Flanged
Locknut,7/16-14
Summary of Contents for Brillion CPPR2-5
Page 4: ......
Page 10: ...1 4 9D990 2401 SAFETY INFORMATION TABLE OF CONTENTS INDEX Table provided for general use NOTES...
Page 13: ...ASSEMBLY 9D990 2401 2 3 TABLE OF CONTENTS INDEX Table provided for general use NOTES...
Page 26: ...4 4 9D990 2401 MAINTENANCE TABLE OF CONTENTS INDEX Table provided for general use NOTES...
Page 45: ...INDEX 8 3 TABLE OF CONTENTS INDEX Table provided for general use NOTES...