OPERATION AND MAINTENANCE
4-7
General Operation
1.
The horsepower requirements are typically 8-10
horsepower per foot of cut. This will vary widely due
to speed, depth, moisture, residue and types of soils.
Local dealers can help in making recommendations
for your areas.
2.
Operating speed is typically 4.5 - 6 mph. Excessive
speed can cause the unit to bounce, uneven depth,
and create a ridge on the outside edges. Too low of
speed may not allow the unit to properly fill in the
center furrow.
3.
Lift wheels must always be in contact with the ground
and carrying some implement weight. Lift wheels are
used to gauge the depth of each frame section and to
control the leveling feature. Maximum discing depth
cannot be achieved by raising the lift wheels off the
ground. Little or no weight on the lift wheels will
cause the frame sections to gouge, side-draft, and
buckle producing inconsistent cutting depth.
4.
Do not turn with the Disc in the ground, this can put
excessive side load on the gangs and hitch. Raise
the unit slightly when making turns to prevent
gouging and pushing a ridge.
Field Operation
1.
Raise the unit to take the weight off of the transport
locks.
2.
Remove the wing lock pins by sliding forward. Unfold
the wings and extend the fold cylinders completely
noting that the transport locks are also disengaged
CAUTION
Failure to remove wing lock pins before unfolding
wings will cause permanent equipment damage.
Summary of Contents for 6250 Disc
Page 13: ...STANDARD SPECIFICATIONS 2 5 Table provided for general use NOTES...
Page 21: ...STANDARD SPECIFICATIONS 2 13 Table provided for general use NOTES...
Page 22: ...2 14 F 733 1120 STANDARD SPECIFICATIONS Figure 2 8 Coil Tine Harrow Placement 40 Model 1 of 2...
Page 23: ...STANDARD SPECIFICATIONS 2 15 Figure 2 9 Coil Tine Harrow Placement 40 Model 2 of 2...
Page 24: ...2 16 F 733 1120 STANDARD SPECIFICATIONS Figure 2 10 Coil Tine Harrow Placement 45 Model 1 of 2...
Page 25: ...STANDARD SPECIFICATIONS 2 17 Figure 2 11 Coil Tine Harrow Placement 45 Model 2 of 2...
Page 26: ...2 18 F 733 1120 STANDARD SPECIFICATIONS Figure 2 12 Coil Tine Harrow Placement 50 Model 1 of 2...
Page 27: ...STANDARD SPECIFICATIONS 2 19 Figure 2 13 Coil Tine Harrow Placement 50 Model 2 of 2...
Page 28: ...Page Intentionally Blank...
Page 30: ...3 2 F 733 1120 ASSEMBLY INSTRUCTIONS Figure 3 1 Center Disc Gang Installation...
Page 34: ...3 6 F 733 1120 ASSEMBLY INSTRUCTIONS Figure 3 5 Outer Wing Frame Installation...
Page 36: ...3 8 F 733 1120 ASSEMBLY INSTRUCTIONS Figure 3 8 Frame and Hitch Assembly Installation...
Page 41: ...ASSEMBLY INSTRUCTIONS 3 13 Figure 3 11 Lift Hydraulic Installation 40 Model...
Page 42: ...3 14 F 733 1120 ASSEMBLY INSTRUCTIONS Figure 3 12 Fold Hydraulic Installation 40 Model...
Page 43: ...ASSEMBLY INSTRUCTIONS 3 15 Figure 3 13 Lift Hydraulic Installation 45 Model...
Page 44: ...3 16 F 733 1120 ASSEMBLY INSTRUCTIONS Figure 3 14 Fold Hydraulic Installation 45 Model...
Page 45: ...ASSEMBLY INSTRUCTIONS 3 17 Figure 3 15 Lift Hydraulic Installation 50 Model...
Page 46: ...3 18 F 733 1120 ASSEMBLY INSTRUCTIONS Figure 3 16 Fold Hydraulic Installation 50 Model...
Page 52: ...3 24 F 733 1120 ASSEMBLY INSTRUCTIONS Figure 3 22 Light and SMV Bracket Installation...
Page 57: ...ASSEMBLY INSTRUCTIONS 3 29 Figure 3 25 Finishing Reel Hydraulic Installation 45 Model...
Page 78: ...4 14 F 733 1120 OPERATION AND MAINTENANCE W Figure 4 17 Harrow Adjustment and Settings...
Page 90: ...NOTES...