Introduction Released
3/35
Cashpower Gemini HMI
– User Guide
© Gyr (Pty) Ltd
Table of Contents
Introduction______________________________________________________________________ 6
Human-Machine Interface (Meter)____________________________________________________ 7
Customer Interface Unit (CIU) _______________________________________________________ 8
Liquid Crystal Display Indications __________________________________________________ 10
Load switch Status Indicator _____________________________________________________ 11
Alarm Indicator ________________________________________________________________ 11
Remaining Credit Indicator ______________________________________________________ 11
Information Indicator ___________________________________________________________ 11
Currency Indicator _____________________________________________________________ 12
Power (kWh) Indicator __________________________________________________________ 12
Happy and Sad Faces __________________________________________________________ 12
LED Indicators __________________________________________________________________ 13
Rate of Consumption Indicator (Rate LED) __________________________________________ 13
Alarm LED (Customer Interface Unit Only) __________________________________________ 13
Optical Communications Port (Meter only) ___________________________________________ 14
General Meter Operation __________________________________________________________ 15
Entering tokens via the keypad ___________________________________________________ 16
Token Processing _____________________________________________________________ 16
Incomplete Token ___________________________________________________________ 16
Complete Token ____________________________________________________________ 16
Token Accepted _________________________________________________________ 16
Token Accepted as a Valid Key Change Number _______________________________ 16
Token Overflow Rejection _________________________________________________ 17
Incorrect Token __________________________________________________________ 17
Duplicate Token _________________________________________________________ 17
Expired Token___________________________________________________________ 17
Token Decryption and Processing _________________________________________________ 17
Electricity Credit Token _______________________________________________________ 18
Set 1st Dispenser Key Token __________________________________________________ 18
Set 2nd Dispenser Key Token __________________________________________________ 18
Clear Tamper Token _________________________________________________________ 18
Set Power Limit Token _______________________________________________________ 18
Set Credit Levels Token ______________________________________________________ 18
Clear Credit Token __________________________________________________________ 18
Initiate Dispenser Test Token (Non Meter-Specific Token) ___________________________ 19
Commissioning Token (Non Meter-Specific Token) _________________________________ 19
Commissioning Token (Meter-Specific Token) _____________________________________ 19
Decommissioning Token (Meter-Specific Token) ___________________________________ 19
Set Credit Metering Mode (Meter-Specific Token) __________________________________ 19
Set Prepayment Metering Mode (Meter-Specific Token) _____________________________ 19
Set Energy Limiting Mode (Meter-Specific Token) __________________________________ 20
Set DAE Value (Meter-Specific Token) ___________________________________________ 20
Force Load Switch Open (Meter-Specific Token) ___________________________________ 20
Commissioning and Decommissioning the Meter _____________________________________ 20
Power Limiting ________________________________________________________________ 20