Assembly Instructions
7/8/20
Third Function Valve Kit #380-354A Installation Instructions Manual No. 380-353M
5
Cross Beam & Hose Holder Assembly
Figure 6
Bulkhead Mount Assembly
Refer to Figure 3 on page 3, Figure 6, & Figure 7:
1. Orient as shown and attach bulk head mount (#27) to
the right-hand side of loader crossbeam “F. Secure
mount with u-bolt (#26) and hex whiz nuts (#21).
Tighten hex whiz nuts to the correct torque.
2. Remove jam nuts on bulkhead adapters (#22). Insert
bulkheads through holes (A & B) in mount (#27) and
secure with removed jam nuts. Tighten jam nuts.
3. Attach adapters (#23) to the bulkhead fittings (#22).
4. Attach male coupler (#24) to adapter (#23) in line
with hole (A). Tighten coupler to the adapter.
5. Attach female coupler (#25) to adapter (#23) in line
with hole (B). Tighten coupler to the adapter.
6. Attach 72" long hydraulic hoses (#20) to bulkhead
adapters (#22).
Refer to Figure 3 on page 3 & Figure 8:
7.
Install female couplers (#18) and black dust
plugs (#19) to hydraulic hoses (#20).
8. Route hydraulic hoses (#20) along the loader arm
and through loader hose loop bracket “G” to the third
function valve assembly (#12).
9. Connect quick coupler (#18A) to quick
coupler (#14A), port “A” on valve block (#12).
10. Connect quick coupler (#18B) to quick
coupler (#14B), port “B” on valve block (#12).
11. Secure hydraulic hoses (#24) as needed with
cable ties (#5).
27
21
25
24
22
26
23
20
74534
F
NOTE:
Quick couplers (#18A & #14A) are in line
with male coupler (#24). Quick couplers
(#18B & #14B) are in line with female coupler (#25).
Bulkhead Mount with Flat Faced Couplers
Figure 7
Hose Route Along Loader Arm
Figure 8
73126
21
22
23
24
25
26
27
A
B
G
37030
20
20