background image

2

B. Drain Connections

The MB-18 Features two (2) 3/4" MPT connections on the left side (from the front) of the
machine for the cold plate drain system and a third (3rd) 3/4" FPT fitting for the drip tray drain
located on the right hand side of the machine.  The cold plate drains should be plumbed 
independent from the drip tray drain and adequate slope and air gap should be provided to 
prevent back up and potential contamination.  Drain lines should be insulated with a closed cell
insulation to prevent condensation.  

Use caution to prevent gaps in insulation that can cause

condensation traps.

C. Water/Soda and Syrup Connections

Connect plain and carbonated water lines as desired.  Refer to Figure 1 for details.  All water
and chilled syrup (brands) are 3/8" barb.  All ambient syrups (flavors) are 1/4" barb.  Pressurize
and test the system for leaks.

1.5

ELECTRIC POWER SUPPLY

WARNING:

THIS APPLIANCE MUST BE EARTHED.  THIS DISPENSER MUST BE ELECTRICALLY
GROUNDED TO AVOID DANGER TO THE OPERATOR.  THE POWER CORD PROVIDED HAS
A THREE PRONG GROUNDED PLUG.  IF A THREE HOLED GROUNDED ELECTRICAL
OUTLET IS NOT AVAILABLE, USE AN APPROVED METHOD OF INSURING A PROPER
GROUND TO THE DISPENSER.

NOTE

Electrical connections must be installed and maintained in accordance with Federal, State, and
Local requirements.

A. The electric power supply must be a 20 amp three prong, ground convenience outlet having the

same configuration as the power cord.

B. Outlet must have proper voltage, cycles and ampere ratings.  See Dispenser Name Plate for 

ratings.

NOTE

Do not plug into electrical outlet unless ratings on name plate agree with local current available.

1.6

SYSTEM CHECK

WARNING:

ICE AUGER AND BIN AGITATION SYSTEM WILL OPERATE AUTOMATICALLY.  DO NOT
PLACE HANDS OR ANY BODY PARTS WITHIN THE BIN OR IN THE ICE CHUTE.

A. With power connected, remove drip tray assembly and sanitary cover from ice bin.  Raise the

tower shroud by lifting at the front.  Use the provided prop rod to secure the shroud in the raised
position.

B. Push on ice cup lever to activate ice auger and bin agitation system.  Verify auger rotation by

viewing through the ice chute door.  Verify bin agitator rotation inside ice bin.

2. START UP, PERIODIC MAINTENANCE, CHECKLIST, AND CLEANING GUIDE

2.1

CLEANING AND SANITIZING INSTRUCTIONS

A. GENERAL INFORMATION

1. Lancer equipment (new or reconditioned) is shipped from the factory cleaned and sanitized

in accordance with NSF guidelines.  This equipment must be cleaned and sanitized after 
installation is complete, and the operator of the equipment must provide continuous 
maintenance as required by this manual and/or state and local health department 
guidelines to ensure proper operation and sanitation requirements are maintained.

NOTE

The cleaning and sanitizing procedures provided herein pertain to the Lancer equipment 
identified by this manual.  If other equipment is being cleaned, follow the guidelines 

Summary of Contents for 85-10018-126

Page 1: ...ounds 240 kg Operating 800 pounds 363 kg ELECTRICAL Operating Voltage 115 Hertz 60 Amps 20 This initial draft issue is released for field test purposes ONLY DATE 06 18 01 P N 28 0466 6655 LANCER BLVD...

Page 2: ...PPLY ASSEMBLY 10 i MANUFACTURERS INTRODUCTION High Volume Free Standing Fountain Drink Dispenser The unit is designed with the highest quality components to be user and service friendly Most set up pa...

Page 3: ...ater supply must be protected by means of an air gap a backflow prevention device located upstream of the CO2 injection system or another approved method to comply with NSF standards A backflow preven...

Page 4: ...ng ground convenience outlet having the same configuration as the power cord B Outlet must have proper voltage cycles and ampere ratings See Dispenser Name Plate for ratings NOTE Do not plug into elec...

Page 5: ...E Extended lengths of product lines may require that an additional volume of cleaning solution be prepared 2 Sanitizing solutions should be prepared in accordance with the manufacturer s written recom...

Page 6: ...Take care to carefully lift the tower shroud out of the way of the auger tube 4 Remove the auger tube in a similar fashion by lifting it straight up and out of the bin g Remove the Agitator Wheel Ass...

Page 7: ...at least 30 minutes M Disconnect CO2 supply hose from the tank N Reconnect syrup lines to syrup containers for example quick disconnects figal containers etc and ready unit for operation O Draw drink...

Page 8: ...d select keypad on the left hand side of machine ice speed defaults to middle selection if not otherwise selected Selection light will indicate choice C Fill cup with desired amount of ice D Place cup...

Page 9: ...stment STIR is for the auger stir speed and is also requires a setting of 1 through 10 b AUGER SWITCH MENU The auger switch menu selects whether the cup lever or the push buttons initiate ice dispensi...

Page 10: ...se is kinked B Replace Drain Hose Light Emitting Diodes LEDs are provided on the PC Board to aid in troubleshooting electrical difficulties Referring to the wiring diagram included in this manual also...

Page 11: ...375 2 MOUNT BRKT TO MOTOR ICE CHUTE ASSEMBLY 05 0925 CHUTE IBD 1 54 0191 TUBE PRINTED IBD 1 05 0999 LEVER CHUTE IBD 1 05 1488 RESTRICTOR CHUTE IBD 1 12 0244 SWITCH CHUTE 1 04 0268 SCREW 6 19 X 625 1 H...

Page 12: ...Y SYRUP J3 1 VALVES 33 THRU 39 52 2383 WIRE ASSY RIBBON 2 INTERCONNECT TO CPU 52 2384 WIRE ASSY POWER SUPPLY 1 POWER TO CPU 52 2385 WIRE ASSY ICE DISPENSE 1 ICE CHUTE SWITCH TO INTERCONNECT 52 2386 WI...

Reviews: