background image

PAGE 5

Current time of day needs to be entered during initial installation, and adjusted when daylight saving time begins or ends. 

If an extended power outage occurs and depletes the on-board non-rechargeable coin cell battery, when power resumes 

the time of day should be reset and battery replaced.

STEP 1

STEP 2

STEP 3

STEP 1

 – Press 

CLOCK

STEP 2

 - Current Time (hour): Set the hour of the day using 

 or 

 buttons. AM/PM toggles 

after 12. Press 

NEXT

 to go to Step 3. 

STEP 3

 - Current Time (minutes): Set the minutes of the day using 

 or 

 buttons. Press 

NEXT to exit Set Time of Day. Press 

REGEN

 to return to previous step.

RETURN TO NORMAL MODE

SET TIME OF DAY

ADJUST HARDNESS, DAYS BETWEEN REGENERATIONS,

OR TIME OF REGENERATION

STEP 1

STEP 2

STEP 4

STEP 1

 - Press 

NEXT

 and 

 simultaneously for 3 seconds to access Installer Display Settings.

STEP 2

 – Hardness: Set the amount of hardness in grains of hardness as calcium carbonate per 

gallon using the 

 or 

 buttons. The default is 20 with value ranges from 1 to 150 in 1 grain 

increments. Note: The grains per gallon can be increased if soluble iron needs to be reduced. Press 

NEXT

 to go to step 3. Press 

REGEN

 to exit Installer Display Settings.

STEP 3

 – Day Override: Set the 

maximum number of days between regenerations. If value set to 

“OFF”, regeneration initiation is based solely on volume used. If value is set as a number (allowable 

range from 1 to 28) a regeneration initiation will be called for on that day even if sufficient volume of 

water were not used to call for a regeneration. Set Day Override using 

 or 

 buttons:

  •  number of days between regeneration (1 to 28); or

  •  “OFF”.

Press 

NEXT

 to go to step 4. Press 

REGEN

 to return to previous step.

STEP 4

 – Next Regeneration Time (hour): Set the hour of day for regeneration using 

 or 

 

buttons. AM/PM toggles after 12. The default time is 2:00 AM. Press 

NEXT

 to go to Step 5. Press 

REGEN

 to return to previous step.

STEP 3

Summary of Contents for X Factor Series

Page 1: ...ner This unit is designed to give you many years of trouble free service When installed in accordance with the following instructions and if given reasonable care clear soft water will be the result F...

Page 2: ...ne prior to connecting the drain line flow control fitting Leave at least 6 between the drain line control fitting and solder joints when soldering pipes that are connected on the drain line control f...

Page 3: ...er supply inlet after pressure tank and near a source for waste water utility sink floor drain or sewer line A 115 120V 60 Hz uninterrupted outlet is required Keep softener far enough away from walls...

Page 4: ...the overflow Do not connect the tubing to the drain line on the control valve Do not run tubing above overflow height at any point PROGRAMMING THE CONTROL VALVE Note A quick reference card is stored i...

Page 5: ...Set the amount of hardness in grains of hardness as calcium carbonate per gallon using the or buttons The default is 20 with value ranges from 1 to 150 in 1 grain increments Note The grains per gallon...

Page 6: ...g steadily to drain without the presence of air momentarily press REGEN again Display will read RINSE Open the outlet valve of the softener or if using optional bypass place to NORMAL OPERATION MODE f...

Page 7: ...is required The bypass consists of two interchangeable plug valves that are operated independently by red arrow shaped handles The handles identify the flow direction of the water The plug valves ena...

Page 8: ...reinstall the PC board position the lower edge of the PC board so that the holes in the PC board line up with the plastic pins Push the top of the PC board towards the valve until it snaps under the...

Page 9: ...atent 6402944 is a one piece design which allows the stack to be removed using your fingers The exterior of the stack is sealed against the body bore with self lubricating EPDM o rings while the inter...

Page 10: ...l flow control assembly is installed in an easy to access refill elbow located on top of the control valve The refill flow control assembly is attached to the control valve with a locking clip The loc...

Page 11: ...y E White 5 1 V3010 1F Injector Assy F Blue 5 1 V3010 1G Injector Assy G Yellow Not Shown V3170 O Ring 011 Not Shown V3171 O Ring 013 Injector plug and injector each contain one 011 and one 013 O Ring...

Page 12: ...lbow Locking Clip 1 2 PKP10TS8 BULK Polytube insert 5 8 Option 3 V3192 WS1 Nut Drain Elbow Option 4 V3158 01 WS1 Drain Elbow Male 1 5 V3163 O ring 019 1 6 V3159 01 WS1 DLFC Retainer ASY 1 7 V3162 007...

Page 13: ...Description 1 2 V3151 Nut 1 Quick Connect 2 2 V3150 Split Ring 3 2 V3105 O Ring 215 4 2 V3149 1 PVC Male NPT Elbow Item No Qty Part No Description 1 1 H4600 3 8 Safety Brine Valve 2 2 10151 Pin 3 1 H4...

Page 14: ...iston not in home position d Press NEXT and REGEN for 3 seconds or unplug power source jack black wire and plug back in to reset control valve e Motor not inserted fully to engage pinion motor wires b...

Page 15: ...PAGE 15...

Page 16: ...PAGE 16 11 19 A DIVISION OF C B TOOL CO 1340 MANHEIM PIKE LANCASTER PA 17601 3196 TEL 717 397 3521 FAX 717 392 0266 www lancasterwatergroup com E mail info lancasterwatergroup com...

Reviews: