Installation Preparation
⚠
Before installing the new mixer it is essential that you thoroughly flush through the supply pipes in order to
remove any remaining solder, swarf or impurities from your system. Failure to carry out this simple procedure
could cause problems or damage to the workings of the mixertap or boiler.
We recommend installing particle filters (not shown) and isolation valves (B5) to both the hot and cold feed pipes
in an accessible position. This will help to prevent premature failure of the valves and ease any future
maintenance.
Ensure you have suitable domestic hot and cold water pressure before installing this product (see technical data
for more information).
All parts should be removed from their packaging and inspected for any transport damage and that all parts are present
prior to installation.
Shut off your water heating system and ensure that your mains stopcock is closed. Open the lowest hot and cold taps in
the house and allow the water to run until fully stopped.
If replacing an existing tap, remove the tap & clean the end of the feed pipes using wire wool, the tap hole area should be
free from dirt and sealant. Loosely position the tap and tail pipes to check if any alteration to the existing pipework is
required, if this is the case do this now.