12
Cold Laminate Processing
【
1
】
Install the paper tube holder on the film shaft.
All 6 film shafts are common parts.
Use hex wrench to move or fixate the branch pipe holder.
【
2
】
Install the under-film.
Refer to the figure below to pass the under-film while laminate roller (top) is lifted.
【
3
】
Install the laminate film.
Pass the laminate roller through the under roller with the release paper attached and then put down the laminate
roller.
Installation and Processing of Cold Laminate Film
Fixate 4 sides of each
branch pipe holder.
Under-film
Laminate film
①
Idle roller (front)
⇒②
front signboard
⇒③
laminate roll
⇒④
back signboard
Under-film