EL-DB EVO N
8
EN
cod. 3541P770 - Rev. 00 - 06/2018
5.4 Wiring diagram
fig. 23 - Wiring diagram
32
Heating circulating pump (optional)
42
DHW temperature probe (optional)
72
Room thermostat (optional)
130
DHW circulating pump (optional)
138
External probe (optional)
139
Remote timer control (optional)
211
Burner connector
246
Pressure transducer
278
Double sensor (h safety)
304
Stage 2 burner connector (only version with 6 and 7 elements)
DBM06D
T°
T°
278
OUT +5V GND
246
L
N
4
5
6
78
9
10
11
12
13
14
15
16
17
18
DSP05
LN
230V 50Hz
32
138
139
72
21
1
304
130
42