29
ELECTRODE-DEFLECTOR POSITIONING
After mounting the choke (or chokes), check the correct position of the electrodes and deflector, following the
listed specifications (mm). It is advisable to check the specifications after each intervention on the combustion
head.
ECO 30
ECO 30/2 - ECO 40/2
OPERATION CYCLE
A
- flame ignition
T1
pre-ventilation time 13 sec. 15 sec.
B
- presence of flame
T2
safety cut-off time 10 sec. 10 sec.
C
- end of starting procedure
T3
pre-ignition time
13 sec. 15 sec.
C-D
- normal operation
T3n
post-ignition time
15 sec. 10 sec.
D
- thermostat shut-down (TA-TC)
ECO 30
Thermostat room temperature - furnace
Motor
Transformer
Electromagnetic valve
Photo resistance
LOA 24 LMO 14
Summary of Contents for ECO 30
Page 2: ......
Page 93: ...GR...
Page 97: ...97 l ECO 30 MPE LOA 24 LMO14 F FA FCA FR IG IMA MB MPE Landis TC TS TR VE...
Page 99: ...99 L H d 1013 mbar 0 45 bar 4 60m d10 2 d12 2...
Page 104: ...104 Y EYH LMO...
Page 105: ...105 ECO 30 A 1 max ECO 30 2 ECO 40 2 1 2 2 SQN 70...
Page 106: ...106 1 2 F P VE1 1 VE2 2 G1 1 G2 2 A ECO 30 ECO 30 2 ECO 40 2 B VE1 G1...
Page 107: ...107 12 bar 11 15 bar 1 2 3 4 4 m CO2 CO2 CO2 11 12 Bacharach 2 BH BH ECO 30 2 ECO 40 2...
Page 108: ...108...
Page 109: ...109 1 2 3 2 ECO 30 2 ECO40 2 4 5 6...
Page 110: ...110 a b c a b c a b a b a b c a b a b c a b a b c a b...
Page 111: ......