
JX|8 Sheartec:II Jointer \ Setup Assembling
17
Assembling
Machine Preparation and Setup:
1.
The machine may be supplied with four installed wheels (depending on model), two of which are
locking style (infeed side). Lock these two wheels, by turning the thumbscrew clockwise, when the
machine is placed and before operation (Fig. 4). Loosen the two thumbscrews when moving the
jointer.
FIGURE 4: WHEEL LOCKS
2.
Position
the Jointer Body on the Stand with the cutterhead pulley directly above and on the same side as
the motor pulley.
NOTE: Have help lifting and positioning the jointer body onto the stand! Or use a forklift as
described earlier.
FIGURE 5: ASSEMBLING JOINTER
Summary of Contents for Sheartec II JX 8
Page 1: ...JX 8 Sheartec II Jointer Owner s Manual Owner s Manual MJ8X72P 0130...
Page 21: ...JX 8 Sheartec II Jointer Setup Assembling 21 FIGURE 11 Fence Stope Locks...
Page 36: ...34 JX 8 Sheartec II Jointer Wiring JX 8 ShearTec II MJ8X72E 0130...
Page 37: ...JX 8 Sheartec II Jointer JX8 Sheartec II Parts 35 JX8 Sheartec II Parts Tables Components...
Page 38: ...36 JX 8 Sheartec II Jointer Wiring Cutterhead Drivetrain...
Page 39: ...JX 8 Sheartec II Jointer JX8 Sheartec II Parts 37 Fence...
Page 40: ...38 JX 8 Sheartec II Jointer JX8 Sheartec II Parts Stand Motor...