32
PX|20 Sheartec:II Planer \ Lubrication
Lubrication
Regular monitoring and replacement of lubrication is needed.
Figure 25 Table
NO.
POSITION
GREASE
OIL
1
GEAR BOX
NO
YES
2
CHAIN
YES
NO
3
CHAIN
YES
NO
4
CHAIN
YES
NO
5
CHAIN
YES
NO
6
BUSHING
NO
YES
7
LEAD SCREW
YES
NO
FIGURE 26: LUBRICATION
FIGURE 25: LUBRICATION
·
The Gear Box oil must be changed after 2500
hours of work. (Fig. 25)
·
All chains must be lubricated regularly. (Fig. 25
& 26)
·
Every 30 hours, lubricate the bushings. (Fig. 27)
·
Lubricate the four lead screws regularly. (Fig.
26).
·
Teflon Lube is the preferred lubrication for the
lead screws.
FIGURE 27: LUBRICATION
Summary of Contents for MPLANPX20-0130
Page 1: ...PX 20 Sheartec II Planer Owner s Manual MPLANPX20 0130 2 25 2021...
Page 22: ...22 PX 20 Sheartec II Planer Setup Assembling FIGURES 10 12 DRO ADJUSTMENT...
Page 35: ...35 PX 20 Sheartec II Planer Wiring...
Page 36: ...36 PX 20 Sheartec II Planer Replacement Parts Diagram Replacement Parts Diagram Base...
Page 37: ...37 PX 20 Sheartec II Planer Replacement Parts Diagram Table...
Page 38: ...38 PX 20 Sheartec II Planer Replacement Parts Diagram Cutter Assembly...