Page 67
8.G.18 Lead Lag Leader
Config (continued)
With the Master Control now Enable, press the setting
box labeled ‘CH setpoint’. Here you can adjust the
desired Lead/ Lag system setpoint.
With desired CH Setpoint set, then press ‘Advanced
Settings’.
From the ‘Warm Weather Shutdown’ screen, adjust the
setpoint.
When finished, press the arrow to advance to the ‘Rate
Allocation’ screen.
Adjust the “Base Load Common” value to the number
of boilers in the cascade system. See chart for values.
Chart for base values
From this screen, use the Left or Right arrows to scroll
to other screens. Make adjustments if needed.
If you are using Outdoor Reset for Lead/ Lag, adjust the
Maximum Outdoor Temp, Minimum Outdoor Temp and
Low Water Temp by touching each set point line. The set
point screen will appear. Make the adjustment,
then press OK.
When finished, press the arrow to advance to the ‘Warm
Weather Shutdown’ screen.
N
EO
T
HERM
Commercial Boilers and Water Heaters
Summary of Contents for NEOTHERM NTH
Page 4: ...LAARS Heating Systems ...
Page 36: ...Page 36 Figure 22 Hydronic Piping Single Boiler Zoning with Circulators LAARS Heating Systems ...
Page 52: ...Page 52 Figure 36 Ladder Diagram 7 H Ladder Diagram LAARS Heating Systems ...
Page 100: ...Page 100 Parts Illustration 4 Internal Components Sizes 750 850 LAARS Heating Systems ...
Page 102: ...Page 102 Parts Illustration 6 Gas Train Components Sizes 600 850 LAARS Heating Systems ...