background image

Page 10

LAARS Heating Systems

Figure 9. Condensate drain tube outlet.

NOTE:

 All internal electrical components have

been prewired. No attempt should be made to connect

electrical wires to any other location except the wiring

box designated above.

Wiring connections are indicated on the wiring

diagram (see Figure 10).

3.7 Main Power

Connect a 15 amp, fused, 120-volt supply to the

main power switch (hot leg is connected directly to

switch). Neutral leg is connected directly to the white

wire. Ground wire can be connected to the grounding

screw in the box.

3.8 Temperature Control

Connect the tank aquastat to the red and white/

red wires marked “T”. Do not connect two units to the

same set of aquastat contacts.

SECTION 4.
Start Up

4.1 Filling the System

1.

Open all valves.

2.

Fill 9600 HWG Water Heater and the system

completely.

3.

Purge air from system. Bleed air from 9600

HWG using the air bleed at top of thermostatic

valve inside unit under access plate on top panel.

4.

Set aquastat to call for heat, turn on power at

main switch for 30 seconds, then turn off.

5.

Bleed 9600 HWG Water Heater and system

again. After system is fully purged, the 9600

HWG Water Heater is ready for firing.

4.2 Operation Checklist

1.

Be sure that system has been filled properly (see

above) and is leak tight.

2.

Open gas cock(s) and open manual gas shutoff

valve by turning to “on” position (see Figure 11).

3.

Turn on main switch, set aquastat to call for

heat.

4.

Blower will come on.

5.

NOTE:

 Burner may not ignite on first attempt

because of air contained in gas lines. In this case

blower will stop after 5 minutes. Should this

happen, turn off main switch. Wait five minutes

and turn on switch again.

If burner fails three times, refer to Service Manual.

6.

After placing the water heater in operation, the

burner safety shutoff device must be tested. To

test, disconnect ignitor plug at ignitor. Attempt

to start appliance. After the burner control has

completed three complete cycles the gas valve

must not open again and the VALVE / FLAME

light on the burner control must flash. Failure to

operate in this manner must be corrected by a

qualified service contractor or gas company.

Safe lighting and other performance criteria were

met with the gas manifold and control assembly

provided on the water heater when it underwent

tests specified in ANSI Z21.10.3-Latest Edition

and CAN / CGA 1 - 4.3 Latest Edition.

CAUTION:

 Should any pronounced odor of gas

be detected or if the gas burner does not appear

to be functioning in a normal manner, close main

shut off valve and contact your heating

contractor, gas company or factory

representative.

7.

Changing the gas orifice.

A 9600 HWG tune-up kit is available from your

supplier. It contains a larger () and

smaller orifice (marked -). If the firing rate is

low, install the larger diameter orifice. Shut off

electricity and gas to the unit. Loosen the gas

orifice union (see Figure 12) and move the lower

half of the union far enough to the side to

remove the orifice. Change orifice. Reassemble,

Figure 10. Electrical hook-up.

GRN

BLK

WH

RED (LOW VOLTAGE) - T

WH/RED (LOW VOLTAGE) - T

GROUND

120 VAC LINE

120 VAC NEUTRAL

SEE

APPLICABLE

WIRING

SCHEMATICS

IN THIS

MANUAL

SWITCH BOX

Summary of Contents for 9600 HWG

Page 1: ...service technician qualified in hot water boiler installation and maintenance Improper installation and or operation could create carbon monoxide gas in flue gases which could cause serious injury pro...

Page 2: ...ide Wall 5 2 4 Locating Unit for Proper Vent Height 5 2 5 Locating Unit with Respect to Ventilation 5 2 6 Locating Unit with Respect to Storage Tanks 5 SECTION 3 Installation 3 1 Installing Vent Pipin...

Page 3: ...rements take precedence over the general instructions contained herein All electrical wiring is to be done in accordance with local codes or in the absence of local codes with 1 the National Electrica...

Page 4: ...y AGA CGA for installation on combustible flooring in basements in closets utility rooms or alcoves It must not be installed on carpeting The location for the unit should be chosen with regard to the...

Page 5: ...vent locations you select must permit direct pipe runs to the terminal from the boiler Since the 9600 HWG Water Heater is designed to drain any water that collects in the vent it is important that yo...

Page 6: ...Install a shut off valve in the piping between the thermometer fitting and the tank The following steps are recommended for vent installation 1 Obtain the necessary 3 or 4 diameter plastic piping and...

Page 7: ...ntains a minimum of 10 psi static pressure If water hardness is greater than 10 grains a water soft ening or particle suspension device must be installed be fore the heater or warranty will be void Co...

Page 8: ...Page 8 LAARS Heating Systems Figure 7 Two temperature system Figure 6 Single 9600 HWG Storage Tank...

Page 9: ...9600 HWG Water Heater Page 9 Figure 8 Multiple 9600 HWG s storage tanks...

Page 10: ...t attempt because of air contained in gas lines In this case blower will stop after 5 minutes Should this happen turn off main switch Wait five minutes and turn on switch again If burner fails three t...

Page 11: ...s or hose see Figure 9 3 The pressure relief valve should be operated manually at least once a year To do this place a suitable container under the relief valve drain pipe The discharge from this valv...

Page 12: ...tall new O ring valve top and replace valve top on valve and install and tighten screws 6 Restore pressure to water heater bleed air from the petcock on the valve and restart water heater 7 Replace ac...

Page 13: ...heater for the space heating application shall be suitable for use with potable water Toxic chemicals such as used for boiler treatment shall not be introduced into the potable water used for space h...

Page 14: ...Defective low limit operating control safety limit or system differential pressure switch 2 Jump control wires one control at a time to identify open circuit in control no continuity FOR DIAGNOSIS ONL...

Page 15: ...ge 15 Figure 16 Wiring diagram Caution Label all wires prior to disconnection when servicing controls Wiring errors can cause improper and dangerous operation Verify Proper Operation After Servicing F...

Page 16: ...Page 16 LAARS Heating Systems Figure 18 Lighting and shutdown procedures...

Page 17: ...nstallation manual Set regulator for maximum run pressure of 9 3 Remove blower and inspect flame holder burner for hole 4 Check that the blower flanges and gas piping are sealed 6 4 Occasional Lockout...

Page 18: ...310 Blower Assembly HWG 250 2400 086 Combustion Coil Assembly 9 2400 082 Flame Holder 7 2400 308 Flame Holder HWG 250 2400 286 Ignitor 2400 088 Capacitor Motor Starter 2400 224 Control Board 2400 014...

Page 19: ...9600 HWG Water Heater Page 19...

Page 20: ...vice Advisors 20 Industrial Way Rochester NH 03867 603 335 6300 Fax 603 335 3355 Applications Engineering 1869 Sismet Road Mississauga Ontario Canada L4W 1W8 905 238 0100 Fax 905 366 0130 www Laars co...

Reviews: