background image

INSTRUCTION MANUAL

LSC 014 -UK- REV. 01

               27

  

   

8.7  KEY TO PARTS

 1

 

Drip tray

 2

 

Steam wand

 3

 

Foot

 4

 

Water tank

 5

 

Side panel

 6

 

Steam delivery lever

 7

 

Top cup grid

 8

 

Cup guard

 9

 

Control panel

10

 

Delivery group

11

 

Filter holder

12

 

Drip tray grid

13

 

Boiler status control light

14

 

Control light indicating water temperature for coffee 85 °C (91 °C on the MINI VIVALDI II version) 

15

 

Control light indicating water temperature for coffee 90 °C (92 °C on the MINI VIVALDI II version) 

16

 

Control light indicating water temperature for coffee 95 °C (93 °C on the MINI VIVALDI II version) 

17

 

Control light indicating water temperature for coffee 100°C (94°C on the MINI VIVALDI II version) 

18

 

Control light indicating water temperature for coffee 105°C (95°C on the MINI VIVALDI II version) 

19

 

Control light indicating water temperature for coffee 110 °C (96 °C on the MINI VIVALDI II version) 

20

 

Control light indicating water temperature for coffee 120°C (97°C on the MINI VIVALDI II version) 

21

 

Control light indicating empty water tank

22

 

Power control light

23

 

Hot water delivery button

24

 

1-cup delivery button

25

 

2-cup delivery button

26

 

On/off button for the boiler for steam and hot water for infusions

27

 

ON/OFF button (machine on/off)

29

 

Hot water spout

29

 

Steam pressure gauge for the boiler for steam and hot water for infusions 

30

 

Motor-driven pump pressure gauge.

Summary of Contents for S1 Mini Vivaldi

Page 1: ...LSC 014 UK REV 01 I N S T R U C T I O N M A N U A L...

Page 2: ...C 60335 2 75 IEC 60335 2 15 EC Declaration of Conformity to the Directive 97 23 EC Pressurised Equipment Directive PED MANUFACTURER La Spaziale SpA ADDRESS Via E Duse 8 Casalecchio di Reno BO ITALIA H...

Page 3: ...ontrol light 13 on 12 Chap 4 COUNTERS Optional p 13 4 1 VISUALIZATION OF PARTIAL AND TOTAL NUMBER OF CUPS OF COFFEE DELIVERED 13 4 2 RESETTING THE PARTIAL COFFEE COUNT 13 4 3 PROGRAMMING 14 Chap 5 CLO...

Page 4: ...hap 7 ROUTINE APPLIANCE MAINTENANCE TO BE PERFORMED BY THE CUSTOMER p 22 Chap 8 DIAGRAMS p 23 8 1 WIRING DIAGRAM 23 8 2 POWER DIAGRAM 24 8 3 TRIAK DIAGRAM 24 8 4 LED CIRCUIT 24 8 5 KEY TO WIRING DIAGR...

Page 5: ...means that the product at the end of its lifetime must be disposed of separately from all the other waste The separate collection of this equipment coming at the end of its lifetime is organized and r...

Page 6: ...ppliance from the mains power Do not allow children or unqualified persons to use the appliance Access to the appliance s service area must be restricted to those persons with the relevant practical e...

Page 7: ...enance are restricted to trained personnel Before plugging the appliance into the mains socket make sure that the data on its rating plate correspond to the data for the place of installation The appl...

Page 8: ...te that the coffee delivery group is heating up and the automatic boiler refill will be activated until the water level set by the manufacturer has been reached 3 Once the filling stage is complete th...

Page 9: ...tach the filter holder 11 to the group 10 without tightening it excessively 4 Place one or two cups below the filter holder 11 5 Press the one cup button 24 to dispense one cup of coffee or the two cu...

Page 10: ...d the control lights 19 20 and 21 will switch on in succession and each control light indicates an increase of one degree centigrade compared to the set temperature Each time that the one cup button 2...

Page 11: ...THE DOSES 1 While the appliance is operating control light 22 lit press and hold down the button ON OFF 27 for about 3 seconds the power control light 22 and the set temperature control light will st...

Page 12: ...ton 23 again 3 5 STEAM DELIVERY Possible only with the boiler on control light 13 on 1 Insert the steam wand 2 into the pitcher containing the drink to be heated 2 Move the steam lever 6 upwards 3 Whe...

Page 13: ...AND TOTAL NUMBER OF CUPS OF COFFEE DELIVERED In normal operating conditions when the button is pressed the display will show the following P 00286 is the partial number of cups delivered since the las...

Page 14: ...lash Proceed in the same way to set the next digits and once the last digit in the PIN has been confirmed if correct then you can have access to the programming mode If the PIN is not correct the disp...

Page 15: ...he programming mode using the buttons to move in the screen will cause the letter Y to start flashing and when the button OK is pressed to confirm the available and stored doses will be cancelled and...

Page 16: ...ed alternatively to the date the display visualizes the following switch on time if the machine is off ON 14 30 or the following switch off time if the machine is on OFF 21 30 NOTE This only occurs if...

Page 17: ...the week Monday will flash Pressing the buttons will select the current day of the week Confirm the selection with the button OK The display will now show The month January will start to flash Pressi...

Page 18: ...will show The day of the week will flash Pressing the buttons it is possible to scroll through the days of the week Once the day to be set is viewed in this case Monday press the button OK to confirm...

Page 19: ...ettings The display will then show the next day Repeat this operation until you get to the day for which different switching on off times are required The day on the display will start to flash pressi...

Page 20: ...alarm occurs when the temperature exceeds 145 C temperature probe short circuit or when it is less than 60 C temperature probe disconnected To cancel the alarm will occur from the display switch off t...

Page 21: ...liance from the mains power and call an authorised technical assistance centre 6 7 BOILER AUTOMATIC REFILL SYSTEM FAILURE Only with boiler switched on This is a blocking alarm and it is signalled by t...

Page 22: ...let it to cool down and then clean the filter holder 11 and filters making sure that no dirt is left inside the filter holder and that all filter holes are clean use an abrasive sponge for this opera...

Page 23: ...MS 8 1 WIRING DIAGRAM 8 CONTROL BOARD EARTH 230 V 115 V SB 1 4 1 2 S2 1 4 F SER 1 SER 2 TOUCHPAD 1 2 1 2 TSC GROUP TRIAK 1 2 1 2 BOILER TRIAK TSB S1 1 2 SL 1 4 1 4 EXTERNAL DISPLAY JP3 JP4 SE SD PHASE...

Page 24: ...1 DISPLAY T2 SER1 PUMP PHASE EV GR EV H NEUTRAL NEUTRAL F3 JP4 M1 M8 M3 M2 M3 T1 SL SB F S2 JP3 M7 T5A FUSE M5 EV AL P2 M1 P1 V M3 F1 F1 R3 R2 U1 R1 F1 in F1 out M2 M1 P2 M3 F1 F1 R3 R2 U1 1 3 R1 F2 i...

Page 25: ...lement Output to phase of triak feeding the boiler heating element Input to phase of triak feeding group heating element Output to phase of triak feeding the group heating element Boiler temperature s...

Page 26: ...ANUAL 26 LSC 014 UK REV 01 8 6 PARTS 8 12 16 6 5 7 8 9 2 29 3 11 1 10 12 28 13 14 15 16 17 18 19 20 21 22 24 23 25 26 27 13 14 15 16 17 18 19 20 21 22 24 23 25 26 27 4 91 92 93 94 95 96 97 8 12 8 12 1...

Page 27: ...l light indicating water temperature for coffee 100 C 94 C on the MINI VIVALDI II version 18 Control light indicating water temperature for coffee 105 C 95 C on the MINI VIVALDI II version 19 Control...

Page 28: ......

Page 29: ...03 2009 Graphics and Printing X TYPE ENGINEERING S r l for LA SPAZIALE S p A...

Page 30: ...La Spaziale S p A Via E Duse 8 40033 Casalecchio di Reno Bologna Italy Tel 39 051 611 10 11 Fax 39 051 611 10 40 E mail info laspaziale com Web Site www laspaziale com...

Reviews: