background image

2.2-2

2

Pipe Sizing

Installation

Instructions

EXAMPLE

(Refer to Fig 2)

IMPORTANT:  If exact length is not on chart, use next longer

length.  Select the size of pipe that shows at least as much

capacity as needed for each piping section.

a. Section A to B of pipe must supply the complete gas

load of 1,500,000 BTUH for the entire building.

Looking at the 5 PSIG sizing chart, the size of pipe

used in conveying gas would need to be sized at 1

inch diameter pipe.  Note that even though furthest

distance from first stage regulator to appliance is 230

ft., we use the 250 ft. length.

b. Section B to C must supply the load of 1,000,000

BTUH.  Select 3/4 inch pipe for Section B to C.

c. Section C to D must supply a load of 750,000 BTUH.

Select 3/4 inch pipe for Section C to D.

d. Section D to E must supply a load of 500,000 BTUH.

Select 1/2 inch pipe.

e. Sections E to F must supply 250,000 BTUH.  Select

1/2 inch pipe.

f. Sections B to C must supply 500,000 BTUH.  Use 1/2

inch pipe.

g. The final section, G to H, needs only 250,000 BTUH

for gas usage.  This section would use 1/2 inch pipe.

Fig. 2

EXAMPLE

Perform pipe sizing for building.

Total heat load is 1,500,000 BTUH.

Quantity 6 - 250,000 BTUH heaters.

Building is 300 ft. long x 40 ft. wide.

Section

BTUH

LP Gas Pipe Size

Gas Load

@ 5 PSIG

A - B

1,500,000

1 in.

B - C

1,000,000

3/4 in.

C - D

750,000

3/4 in.

D - E

500,000

1/2 in.

E - F

250,000

1/2 in.

B - G

500,000

1/2 in.

G - H

250,000

1/2 in.

First Stage Pipe Sizing

5 PSIG Inlet with a 1 PSIG Pressure Drop
Maximum capacity of pipe or tubing, in thousands of BTU/hr. of LP Gas

IMPORTANT:

If exact length is not on chart, use next longer length. Select the size of pipe that shows at least as

much capacity as needed for each piping section.

Pipe Size

Length of Pipe or Tubing

(In Inches)

(In Feet)*

10

20

30

40

50

60

70

80

90

100

1/2

2946

2025

1626

1392

1233

1118

1028

957

897

848

3/4

6161

4234

3400

2910

2579

2337

2150

2000

1877

1773

1

11605

7976

6405

5482

4859

4402

4050

3768

3535

3339

125

150

175

200

225

250

275

300

350

400

1/2

751

681

626

583

547

516

490

468

430

400

3/4

1571

1424

1310

1218

1143

1080

1026

978

900

837

1

2956

2682

2467

2295

2153

2034

1932

1843

1696

1577

* Total length of piping from outlet of first stage regulator to inlet of second stage regulator (or to inlet of second

stage regulator furthest away).

August 1999

Summary of Contents for Pilot Light Ignition

Page 1: ...Pilot Light Ignition Installation and Service Guide Agricultural Animal Confinement Building Heaters 150 22003...

Page 2: ...ay not necessarily depict the actual heater model and are intended for reference only It is very important when using the guide to pay particular attention to any Warning or Caution statements printed...

Page 3: ...ead to property damage personal injury or loss of life GENERAL HAZARD WARNING Failure to comply with the precautions and instructions provided within this guide can result in Death Serious bodily inju...

Page 4: ...uirements 2 8 Thermostat Wiring Models 346 348 377 379 408 410 2 9 1 AS040 2 9 2 AB200 and AB250 2 9 3 Indoor Installation Hanging Instructions 2 10 Air Diverters Two Piece 2 11 1 One Piece 2 11 2 Sec...

Page 5: ...safe clearances to combustibles burner manifold pressure maximum and minimum allowable inlet pressures etc Typical Location Interior or exterior of burner end access panel Part No Varies with design s...

Page 6: ...24 x 19 x 30 21 1 4 x 14 1 2 x 16 3 4 TOP SIDES BACK BLOWER OUTLET GAS L P Gas Supply 6 ft 1 83 m SUPPLY Natural Gas Supply N A 55 90 110 39 61 100 129 43 346 348 377 379 408 410 AS040 L P Natural L...

Page 7: ...l L P Natural Gas Gas Gas Gas M Mo od de el l Ventilation Air Required to Support Combustion Net Weight lbs Shipping Weight lbs Electrical Supply Volts Hz Phase Amp Draw Dimensions Inches L x W x H Mi...

Page 8: ...de headaches dizziness and difficulty in breathing Symptoms of improper combustion affecting livestock can be disease lower feed conversion or death Asphyxiation H Hazard Some p people c cannot s smel...

Page 9: ...e b For Canadian Installations and Applications CAN1 B149 1 or CAN1 B149 2 Installation Codes CSA C22 1 Part 1 Standard Canadian Electrical Code CSA C22 2 No 3 Electrical Features of Fuel Burning Equi...

Page 10: ...o not relight the heater until you are sure that all gas that may have accumulated has cleared away In any event do not relight the heater for at least 5 minutes 15 Non hanging heater installations th...

Page 11: ...te alarms 6 Take time to explain to your customer how to operate and maintain the heater by using this Service Guide Make sure your customer knows how to shut off the gas supply to the building and al...

Page 12: ...measured in inner diameter I D Piping planning and installation must be done by an experienced qualified LP gas installation agency b The minimum pipe size normally used in many situations is 1 2 in n...

Page 13: ...ld use 1 2 inch pipe Fig 2 EXAMPLE Perform pipe sizing for building Total heat load is 1 500 000 BTUH Quantity 6 250 000 BTUH heaters Building is 300 ft long x 40 ft wide Section BTUH LP Gas Pipe Size...

Page 14: ...erature is 10 F Tanks to be refilled by LP gas supplier when liquid propane level is 30 A In the 1 000 gallon tank sizing chart locate 10 F outside temperature B Locate the column which identifies 30...

Page 15: ...y be subjected to abrasive action or physical damage due to vehicular traffic or other causes it must be placed not less than two feet below grade or otherwise protected against such physical damage R...

Page 16: ...the installation may not be obtained It is almost impossible to set all regulators at the identical pressure Therefore the regulator delivering the highest outlet pressure will backpressure the other...

Page 17: ...stions 6 The heater s gas regulator with pressure relief valve should be installed outside of building Any regulators inside the buildings must be properly vented to the outside Local state and nation...

Page 18: ...ak d detectors Make certain that a sediment trap is installed at the gas valve inlet to prevent foreign materials pipe compound pipe chips and scale from entering the gas valve Debris blown into the g...

Page 19: ...ed three wire electrical supply consisting of separate hot neutral and ground leads shall be connected to each electrical outlet that supplies each heater Proper voltage must be supplied to each heate...

Page 20: ...s to squeeze the strain relief and wire bundle together to allow installation of the strain relief back into the junction box 6 Connect the black thermostat cord lead to the lead labeled power supply...

Page 21: ...l supply and close all fuel supply valves to the inlet of the heater 2 Remove the motor access panel located on the back of the case assembly 3 Remove the electrical enclosure cover 4 Remove the elect...

Reviews: