GENERAL IINFORMATION

Pipe sizing is critical to the proper operation of any gas

heating system.  However, piping is dependent on several

factors:

1. Total gas load expressed in BTUH.

2. The gas pressure to be supplied through the piping

system.  This pressure may be expressed in pounds of

pressure per square inch (psi) or inches of water

column (W.C.).

3. Distance that the gas must travel to feed the heater

furthest from the regulator.

This section provides a basic explanation of how to size

piping for the heaters through the use of pipe sizing tables

and a typical example.  In all cases with this example, we will

be using only pounds of pressure, expressed as 5 psi and not

inches of water column.

a. Black iron pipe only was used in this example as it is

less expensive per foot than copper tubing and,

therefore, more commonly used.  However, the same

selection process using copper tubing may be done if

so desired.  Refer to appropriate pipe sizing tables for

copper tubing.  All pipe diameters given are measured

in inner diameter (I.D.).  Piping planning and

installation must be done by an experienced, qualified

LP gas installation agency.

b. The minimum pipe size normally used in many

situations is 1/2 in. nominal.  

c. The information in the pipe sizing tables was obtained

from Engineered Control International, Inc., L.P. Gas

Serviceman’s Manual L545. 

d. Do not attempt gas supply line selection or installation

unless you are properly trained and qualified.

e. All gas supply lines must be leak checked after

installation and when pressurized to provide a safe

installation.  Use only certified, approved leak

detectors.

f. This is one example showing how to size piping for a

building.  Installation layouts differ as do the

pressures being supplied to piping, whether you are

using for LP gas or natural gas and the material (pipe

or copper tubing) being used.

INSTRUCTIONS

a. Determine total gas demand for entire system, by

adding up BTUH input from heater dataplates and

adding demand for any other gas-fired appliances and

any future heaters.

b. Measure the length of piping required from outlet of

first-stage regulator to the appliance furthest away.

No other length is necessary to do the sizing.  In this

example the distance from first-stage regulator to

appliance furthest away is 230 ft. 

c. Make a sketch of the piping system and installation.

See Fig. 1.

Pipe Sizing

Installation

Instructions

Summary of Contents for Pilot Light Ignition

Page 1: ...Pilot Light Ignition Installation and Service Guide Agricultural Animal Confinement Building Heaters 150 22003...

Page 2: ...ay not necessarily depict the actual heater model and are intended for reference only It is very important when using the guide to pay particular attention to any Warning or Caution statements printed...

Page 3: ...ead to property damage personal injury or loss of life GENERAL HAZARD WARNING Failure to comply with the precautions and instructions provided within this guide can result in Death Serious bodily inju...

Page 4: ...uirements 2 8 Thermostat Wiring Models 346 348 377 379 408 410 2 9 1 AS040 2 9 2 AB200 and AB250 2 9 3 Indoor Installation Hanging Instructions 2 10 Air Diverters Two Piece 2 11 1 One Piece 2 11 2 Sec...

Page 5: ...safe clearances to combustibles burner manifold pressure maximum and minimum allowable inlet pressures etc Typical Location Interior or exterior of burner end access panel Part No Varies with design s...

Page 6: ...24 x 19 x 30 21 1 4 x 14 1 2 x 16 3 4 TOP SIDES BACK BLOWER OUTLET GAS L P Gas Supply 6 ft 1 83 m SUPPLY Natural Gas Supply N A 55 90 110 39 61 100 129 43 346 348 377 379 408 410 AS040 L P Natural L...

Page 7: ...l L P Natural Gas Gas Gas Gas M Mo od de el l Ventilation Air Required to Support Combustion Net Weight lbs Shipping Weight lbs Electrical Supply Volts Hz Phase Amp Draw Dimensions Inches L x W x H Mi...

Page 8: ...de headaches dizziness and difficulty in breathing Symptoms of improper combustion affecting livestock can be disease lower feed conversion or death Asphyxiation H Hazard Some p people c cannot s smel...

Page 9: ...e b For Canadian Installations and Applications CAN1 B149 1 or CAN1 B149 2 Installation Codes CSA C22 1 Part 1 Standard Canadian Electrical Code CSA C22 2 No 3 Electrical Features of Fuel Burning Equi...

Page 10: ...o not relight the heater until you are sure that all gas that may have accumulated has cleared away In any event do not relight the heater for at least 5 minutes 15 Non hanging heater installations th...

Page 11: ...te alarms 6 Take time to explain to your customer how to operate and maintain the heater by using this Service Guide Make sure your customer knows how to shut off the gas supply to the building and al...

Page 12: ...measured in inner diameter I D Piping planning and installation must be done by an experienced qualified LP gas installation agency b The minimum pipe size normally used in many situations is 1 2 in n...

Page 13: ...ld use 1 2 inch pipe Fig 2 EXAMPLE Perform pipe sizing for building Total heat load is 1 500 000 BTUH Quantity 6 250 000 BTUH heaters Building is 300 ft long x 40 ft wide Section BTUH LP Gas Pipe Size...

Page 14: ...erature is 10 F Tanks to be refilled by LP gas supplier when liquid propane level is 30 A In the 1 000 gallon tank sizing chart locate 10 F outside temperature B Locate the column which identifies 30...

Page 15: ...y be subjected to abrasive action or physical damage due to vehicular traffic or other causes it must be placed not less than two feet below grade or otherwise protected against such physical damage R...

Page 16: ...the installation may not be obtained It is almost impossible to set all regulators at the identical pressure Therefore the regulator delivering the highest outlet pressure will backpressure the other...

Page 17: ...stions 6 The heater s gas regulator with pressure relief valve should be installed outside of building Any regulators inside the buildings must be properly vented to the outside Local state and nation...

Page 18: ...ak d detectors Make certain that a sediment trap is installed at the gas valve inlet to prevent foreign materials pipe compound pipe chips and scale from entering the gas valve Debris blown into the g...

Page 19: ...ed three wire electrical supply consisting of separate hot neutral and ground leads shall be connected to each electrical outlet that supplies each heater Proper voltage must be supplied to each heate...

Page 20: ...s to squeeze the strain relief and wire bundle together to allow installation of the strain relief back into the junction box 6 Connect the black thermostat cord lead to the lead labeled power supply...

Page 21: ...l supply and close all fuel supply valves to the inlet of the heater 2 Remove the motor access panel located on the back of the case assembly 3 Remove the electrical enclosure cover 4 Remove the elect...

Reviews: