Rigging procedures
Assembly
Procedure
1.
Secure X-UTILT to the wall using M10 screws.
Position X-UTILT with the holes for angle selection at the top.
2.
Secure the U-bracket to X-UTILT.
When using X-US8, the bracket must be secured with the label on top.
label
42
X8 owner's manual (EN) version 1.0