TECHNICAL DOCUMENTATION
STATE REVISION OF THE CHAPTER
IN CONFORMITY
WITH THE
APPROVED
ORIGINAL
PRODUCT
GRANBERING KW
ORD.
DATE
ORD.
DATE
N° DOC.
IM000239
A
20.July.2020
D
PAGE
5/12
N° CHAP.
B
10.June.2022
E
FIRST ISSUE
22.05.2020
C
F
ISSUE
MKTG
INSTALLATION DIAGRAMS
3/4
2
½”
AIR GAP REQUIRED
4D
ELECTRICAL
ACCESS
35 3/8
8 1/8
6 1/8
REFRIGERATION
ACCESS
3 3/4"
19 5/8
SINGLECOIL
19 7/8"
35 7/8"
DRAIN PIPING
LEVELLING
FEET
7 7/8"
24"
FRONT OF CASE
ADD
2’’
TO LENGTH FOR EACH END
NO CLEARANCE REQUIRED AT ENDS OF CASE
24"
7 7/8"
KICKPLATE
LOCATION
3/4
2
½”
AIR GAP REQUIRED
5D
ELECTRICAL
ACCESS
35 3/8
8 1/8
6 1/8
REFRIGERATION
ACCESS
3 3/4"
35 7/8"
19 5/8
SINGLECOIL
DRAIN PIPING
19 7/8"
LEVELLING
FEET
7 7/8"
24"
FRONT OF CASE
ADD
2’’
TO LENGTH FOR EACH END
NO CLEARANCE REQUIRED AT ENDS OF CASE
24"
7 7/8"
KICKPLATE
LOCATION