4.
OPERATING INSTRUCTIONS
4-1
OPERATIONAL FLOW
This section describes basic operational procedures for measurement.
(1) Installing and connecting devices.
Connect canners, etc. to the UCAM-65A and ground the GND terminal.
For details, see “3. CONNECTING DEVICES AND PREPARING FOR MEASUREMENT.”
(2) Connecting sensors
Connect sensors. For wiring, see “3-3 CONNECTING SENSORS.”
(3) Setting required measuring conditions
Set required conditions for the measurement. Contents of basic settings are described in the following section.
For details, see separate volume of “UCS-60A Instruction Manual” or “Control Command Version of the
UCAM-65A.”
- 4-1 -