
9
M
K
26
27
15.
Plug the 2 punch PWB wires into the con-
nectors (27) on the DF main PWB (26).
16.
Install the small clamp (K) on the finisher, then pass and fasten the wires from the motor unit and
hole punch unit.
17.
Attach the ferrite core (M) to the wire.
15.
Raccorder les 2 câbles de la PWB de la per-
foratrice aux connecteurs (27) de la PWB
principale du DF (26).
16.
Monter le petit collier (K) sur le retoucheur puis faire passer les câbles du moteur et de la perfora-
trice dans ce collier pour les fixer en place
17.
Fixer le noyau en ferrite (M) au câble.
15.
Enchufe los 2 cables del PWB de per-
foración a los conectores (27) del PWB prin-
cipal del DF (26).
16.
Instale el sujetador pequeño (K) en el finalizador, después tienda y ajuste los cables de la unidad
motriz y la perforadora.
17.
Fije el núcleo de ferrita (M) al cable.
15.
Die 2 Kabel der Locher-PWB an die Steck-
verbinder (27) der DF-Haupt-PWB (26)
anschließen.
16.
Die kleine Klemme (K) am Finisher anbringen, dann die Kabel von der Motoreinheit und der
Lochereinheit hindurchführen und befestigen.
17.
Den Ferritkern (M) am Kabel befestigen.
15.
Collegare i 2 cavi della scheda a circuiti
stampati di perforazione nei connettori (27)
sulla scheda principale PWB (26) della DF.
16.
Installare il morsetto piccolo (K) sul finitore, e quindi passare e fissare i cavi dall’unità motore e
dall’unità di perforazione.
17.
Applicare il nucleo in ferrite (M) al cavo.
15.
パンチ基板の電線 2 本を DF 主回路基板
(26) のコネクター(27) に接続する。
16.
クランプ小(K)をフィニッシャーに取り付け、モーターユニットとパンチユニットからの電線を
通し、
固定する。
17.
フェライトコア(M)
を電線に取り付ける。
15.
将打孔电路板的 2 根电线与 DF 主电路板
(26) 的接插件 (27) 连接。
16.
把小固定夹(K)安装在装订器上,从电机单元和打孔单元出来的导线穿过固定夹来固定。
17.
用磁环(M)套住导线。
15.
펀치기판의 전선 2 선을 DF 주 회로기판
(26) 의 커넥터 (27) 에 접속합니다 .
16.
클램프 소(K)를 피니셔에 장착 , 모터 유니트와 펀치 유니트에서부터 전선을 통과시키고 고정합
니다 .
17.
페라이트 코어(M)를 전선으로 장착합니다 .
Summary of Contents for TASKalfa 3050ci
Page 4: ...This page is intentionally left blank ...
Page 10: ...This page is intentionally left blank ...
Page 24: ...2LK 2LN 2LM 2LC 1 1 10 This page is intentionally left blank ...
Page 94: ...2LK 2LN 2LM 2LC 2 1 2 70 This page is intentionally left blank ...
Page 550: ...2LK 2LN 2LM 2LC 2 2 12 This page is intentionally left blank ...
Page 660: ...2LK 2LN 2LM 2LC 2 4 10 This page is intentionally left blank ...
Page 682: ...1 1 INSTALLATION GUIDE INSTALLATION GUIDE FOR DOCUMENT PROCESSOR ...
Page 717: ...INSTALLATION GUIDE FOR PAPER FEEDER ...
Page 730: ...INSTALLATION GUIDE FOR LARGE CAPACITY FEEDER ...
Page 745: ...INSTALLATION GUIDE FOR SIDE DECK ...
Page 767: ...INSTALLATION GUIDE FOR SIDE MULTI TRAY ...
Page 803: ...INSTALLATION GUIDE FOR 1000 SHEETS FINISHER ...
Page 816: ...INSTALLATION GUIDE FOR 4000 SHEETS FINISHER ...
Page 832: ...INSTALLATION GUIDE FOR FINISHER ATTACHMENT KIT ...
Page 846: ...INSTALLATION GUIDE FOR CENTER FOLDING UNIT ...
Page 863: ...INSTALLATION GUIDE FOR MAILBOX ...
Page 871: ...INSTALLATION GUIDE FOR PUNCH UNIT ...
Page 891: ...INSTALLATION GUIDE FOR INNER JOB SEPARATOR ...
Page 892: ...1 2 3 A B ...
Page 893: ...7 8 4 5 6 ...
Page 894: ...11 9 10 ...
Page 895: ...A 1 2 3 2 14 15 12 13 16 ...
Page 896: ...B 3 2 1 2 19 17 18 ...
Page 897: ...21 22 20 ...
Page 898: ...26 27 23 24 28 25 ...
Page 899: ...30 29 ...
Page 900: ...INSTALLATION GUIDE FOR RIGHT JOB SEPARATOR ...
Page 901: ...5 1 2 3 4 5 7 7 6 A B C A B ...
Page 902: ...9 10 11 12 13 14 7 8 Ԙ ԙ Ԙ ԙ C ...
Page 903: ...INSTALLATION GUIDE FOR FAX SYSTEM ...
Page 928: ...INSTALLATION GUIDE FOR DOCUMENT TABLE ...
Page 929: ...A C D E F I B G H J M4 14 2 M4 8 7 2 3 1 ...
Page 930: ...5 6 7 4 C A B ...
Page 931: ...8 I 9 J 9 ...
Page 932: ...14 10 11 13 D J 12 ...
Page 933: ...G E F 18 15 16 17 J ...
Page 934: ...H 19 20 ...
Page 935: ...2011 ...
Page 936: ...2011 ...