2L0
1-5-14
1-5-6 Transfer/separation section
(1) Detaching and refitting the transfer roller
Procedure
1. Remove the developing unit (See page 1-5-
11).
2. Remove the drum unit (See page 1-5-12).
3. Slide the paper chute guide and unhook the
hooks.
4. Remove the paper chute guide.
Figure 1-5-19
Hook
Hook
Hook
Hook
Paper chute guide
Paper chute guide
Summary of Contents for ECOSYS FS-1370DN
Page 1: ...SERVICE MANUAL Published in April 2010 842L0111 2L0SM061 Rev 1 FS 1370DN ...
Page 4: ...This page is intentionally left blank ...
Page 10: ...This page is intentionally left blank ...
Page 18: ...2L0 1 1 6 This page is intentionally left blank ...
Page 21: ...2L0 1 2 3 1 Removing the tapes Procedure 1 Remove three tapes Figure 1 2 3 Tape Tape Tape ...
Page 24: ...2L0 1 2 6 This page is intentionally left blank ...
Page 57: ...2L0 1 5 5 5 Unhook seven hooks and then remove the left cover Figure 1 5 6 Left cover Hooks ...
Page 106: ...2L0 2 1 16 This page is intentionally left blank ...
Page 118: ...2L0 2 3 8 This page is intentionally left blank ...
Page 122: ...2L0 2 4 4 This page is intentionally left blank ...
Page 123: ......
Page 124: ......