
17
. INSTRUMENT/SWITCHES/LIGHTS
17-3
VITALITY 50
INSTALLATION
The installation sequence is the reverse of
removal.
OIL METER (2-STROKE)
INSPECTION
Remove the rear body cover. (
13-6)
Disconnect the oil meter wire connectors
and remove the oil meter. Keep the oil
meter float at the lower position.
Measure the resistances between the wire
terminals as
and
shown in the left
figure.
Wire Terminals
Resistance
Green/Red(+)
~
Black(-)
46
Ω
Green(-)
~
Black(+)
∞
•
Align the groove on the fuel unit with
the flange on the fuel tank.
Oil Meter
Float
G/R
B
B
G
Groove
Flange
Before removing the oil meter, be sure
to drain the motor oil and do not allow
sparks or flames near the working area.
Summary of Contents for Vitality 50
Page 20: ...2 GENERAL INFORMATION 2 15 VITALITY 50 WIRING DIAGRAM 2 STROKE ...
Page 21: ...2 GENERAL INFORMATION 2 16 VITALITY 50 WIRING DIAGRAM 4 STROKE ...
Page 47: ...2 GENERAL INFORMATION 2 42 VITALITY 50 Faulty ignition coil ...
Page 66: ...4 LUBRICATION SYSTEM 4 1 VITALITY 50 LUBRICATION SYSTEM 2 STROKE ...
Page 92: ...6 4 STROKE CYLINDER HEAD VALVES 6 1 VITALITY 50 ...
Page 108: ...7 CYLINDER HEAD 2 STROKE CYLINDER PISTON 7 2 VITALITY 50 4 STROKE ...
Page 150: ...10 FINAL REDUCTION 10 1 VITALITY 50 ...
Page 159: ...11 CRANKCASE CRANKSHAFT 11 1 VITALITY 50 2 STROKE Torque 0 8 1 2kg m ...
Page 160: ...11 CRANKCASE CRANKSHAFT 11 2 VITALITY 50 4 STDROKE ...
Page 173: ...12 CARBURETOR 12 1 VITALITY 50 ...
Page 259: ...16 ELECTRICAL EQUIPMENT 16 17 VITALITY 50 ELECTRIC STARTER Starter Motor Starter Relay ...
Page 263: ...16 ELECTRICAL EQUIPMENT 16 21 VITALITY 50 ...
Page 275: ...18 SPECIFICATIONS 18 1 4 STROKE ...