SECTION:
4
SPOOL UPRIGHT SUPPORTS
The IRONMAN TURNSTILE UPRIGHT is a modular turnstile support used to hold coil.
Your machine may have up to t
wo
uprights.
ONE TURNSTILE UPRIGHT ASSEMBLY CONSISTS OF:
(SEE PG. 13)
TURNSTILE UPRIGHT (1)
UPRIGHT BRAKE (2)
BASE PLATE (1)
LOCK THUMB SCREW (1)
TURNSTILE LOCKING PIN (1)
BRAKE THUMB SCREW (2)
WING NUT (1)
SAFETY PIN (2)
LOCK BLOCK (1)
TO ROTATE TURNSTILE FOR TWO-SIDED COIL:
1.
Loosen WING NUT loosen LOCK THUMB SCREW.
2.
Slide LOCK BLOCK outward.
3.
Rotate TURNSTILE 180 degrees.
4.
Slide LOCK BLOCK inward.
5.
Tighten LOCK THUMB SCREW then tighten WING NUT.
SPOOL ASSEMBLY AND LOADING COIL
ONE SPOOL ASSEMBLY CONSISTS OF
: (SEE PG. 13)
SPOOL SHAFT (1)
SPOOL HALF (2)
5/16” QUICK RELEASE PIN (2)
TO LOAD COIL ONTO SPOOL ASSEMBLY:
1.
Remove Safety Pins, Loosen Thumb Screws, Release the safety brakes.
2.
Place the empty spool assembly on the ground or on a flat surface.
3.
Remove one of the 5/16” quick release pins.
4.
Slide the spool half off of the 1¼” spool shaft.
5.
Insert the spool shaft through the center of the coil.
6.
Replace spool half on the spool shaft, and reinstall the 5/16” quick release pin.
7.
Install loaded spool assembly onto the upright. Use of mechanical lifting device recommended.
8.
Engage Safety Brakes; lightly tighten thumb screws And Install Safety Pins.
NOTE
: The spool assembly is adjustable to accept both 5” gutter material (11 ¾” – 12”) and 6” gutter material (15”).
PLACING SPOOL & COIL IN THE UPRIGHT:
Use an approved lifting device in the designated spool lifting area to position the spool assembly into the turnstile upright.
(IMPORTANT! – Please read PRECAUTIONS)
PRECAUTIONS:
➢
Make sure loading area is clean and clear of debris.
➢
Make sure Turnstile Locking Pin is securely installed.
➢
Always wear protective footwear when handling coil.
➢
Never load coil with the brake in closed position.
➢
Never operate machine without first checking brake & pin positions.
➢
Never transport machine without locking brake in closed position and safety pins installed.
10
Summary of Contents for IronMan Half-Round G2
Page 1: ...OPERATING AND MAINTENANCE TROUBLESHOOTING GUIDE Half Round G2 Half Round G2 ...
Page 4: ...3 ...
Page 9: ...8 ...
Page 10: ......
Page 12: ...11 ...
Page 16: ...15 BLUE STATION ...
Page 21: ...20 SECTION 19 GUTTER PROFILE ...