
Initial Powering Operations for the ON-HD Lift
KVAL ON-HD Operation Manual
2-4
Home the Machine Line
How to Power Down the Machine
1.
Switch the green Computer switch to the OFF position.
2.
KVAL also recommends that you turn the disconnect
switches on the electrical cabinets to OFF; this helps
reduce possible damage resulting from power surges from
electrical storms.
The Machine Line must go through a homing routine before any operations are
performed. The homing routine sets a zero reference from which each machine
measures its movement and cutting process.
If power is lost or any machine is reset, the homing routine must be performed
again. Each machine has a
Home
button on it’s associated
Main Control Screen
or the entire machine line can be
Homed
using the
Home Machine Line
button
located on the
Machine Line Screen
.
1
2
Summary of Contents for ON-HD
Page 4: ...KVAL ON HD Operation Manual ...
Page 8: ...KVAL ON HD Lift Manual Table of Contents ...
Page 13: ...Safety First KVAL ON HD Operation Manual 1 5 ...
Page 30: ...Safety Sign Off Sheet KVAL ON HD Operation Manual 1 22 ...
Page 54: ...About the Safety Curtain KVAL ON HD Operation Manual 2 24 ...
Page 70: ...Index Kval ON HD ...
Page 71: ......