Operator’s Tour
2-6
KVAL EP-1 Operation/Service Manual
Description of the Six Light Panel
The six lights on this panel indicate the status of the EP-1 system.
Note:
Refer to the “KVAL EP-1 Service Manual” for information on using this panel
for troubleshooting.
The Sequence that the lights activate is as follows:
1.
Control Power
2.
Overload Relay
3.
E-Stop
4.
Stop
5.
Start
6.
24VDC
Control Power –
light
illuminates when the
Control Transformer
is pulled out and the
power is working on
secondary side-of
transformer
Overload Relay –
The overload circuit is
working when light is
on
E-Stop –
The back
gate is closed and
Frame E-stop is not
activated when this
light is on.
24VDC –
light
comes on once the
ACR is latch and the
24VDC power Supply
is working
Stop –
This light will
be on if Machine
Stop button is deac-
tivated.
Start – T
his light will
be on once the
Machine Start button
is pressed and the
ACR Relay is latched.
Summary of Contents for EP-1
Page 4: ...KVAL EP 1 Operation Service Manual ...
Page 20: ...Getting Help from KVAL 1 14 KVAL EP 1 Operation Service Manual Page Intentionally Left Blank ...
Page 22: ...Safety Sign Off Sheet 1 16 KVAL EP 1 Operation Service Manual ...
Page 38: ...How to Power Down the EP 1 2 16 KVAL EP 1 Operation Service Manual ...
Page 56: ...Troubleshooting the Air Cylinders 4 12 KVAL EP 1 Operation Service Manual ...