SEQUENCE CONTROL:
The installer wiring the relays to the LOAD MANAGER MARK IV controls load
sequencing. In order to limit the sequencing to fewer than 10 channels a 5-
element dipswitch has been provided. This switch locks out the sequencing
function for channels 6, 7, 8, 9, and 10. Placing the #1 switch in the “ON”
position enables channel 6 instantly, not in sequence. Placing the #2 switch in
the “ON” position enables channel 7 and so forth. This sequencing lockout
control has no effect on the load shedding operation. Any or all the channels that
are removed from the sequencer are still controlled by their load shedding
program switches.