INTRODUCTION: 

 

The Load Manager Mark IV is a 10-channel sequencer and load shedding 

controller controlling 10 external relays that are supplied by the installer.  

Provision has been made to permit the installer to sequence only a total of 5, 6, 

7, 8, 9 or 10 channels.  Those channels for which sequencing is not selected will 

be energized constantly and controlled only by there own external, manually 

controlled switches or by the load management circuits. 

 

Load management for the 10 channels is completely independent of the 

sequencing function.  Ten “dip switches” are provided, one for each channel to 

establish the load shedding priority.  These switches permit an absolutely 

arbitrary selection of the shedding sequence and in addition permit any of the 

channels to be “locked out” and not be load shed under any circumstances. 

 

 

INSTALLATION: 

 

Install the Load Manager Mark IV in any convenient location where it is protected 

from water or excessive temperatures.  Figure 1 is an Installation and Wiring 

Schematic illustrating the wiring of the manual control switches and relays. 

 

 

 

NOTE 

 

The LOAD MANAGER MARK IV is designed to operate relays.  It is  

 

not necessary to connect to all of the outputs.  Any outputs at the  

 

discretion of the installer may remain unused.  Nothing need be  

 

connected to the unused outputs.  Relays must have a coil resistance 

 

of 40 ohms or greater. 

 

Summary of Contents for 091-75

Page 1: ...FILE 091 75 REV B DATE 10 19 00 INSTRUCTION MANUAL LOAD MANAGER MARK IV A 10 CHANNEL SEQUENCER AND LOAD SHEDDING CONTROLLER MODEL 091 75 INPUT 12 VOLTS D C 3 YEAR WARRANTY ...

Page 2: ...for each channel to establish the load shedding priority These switches permit an absolutely arbitrary selection of the shedding sequence and in addition permit any of the channels to be locked out and not be load shed under any circumstances INSTALLATION Install the Load Manager Mark IV in any convenient location where it is protected from water or excessive temperatures Figure 1 is an Installati...

Page 3: ...REV A 10 19 00 R E D U C E 1 2 3 4 5 6 7 8 9 YELLOW 10 11 12 13 14 15 16 GROUND THIS LINE POWERS THE LOAD MANAGER CLOSE TO ENABLE LOAD MANAGER S10 K10 ...

Page 4: ......

Page 5: ...priority of load shedding Each set of dip switches controls one output and contains 10 individual switches Setting any one of the individual switches to the ON position determines the load shed priority of that output That is placing the 1 switch in the ON position determines that this output will be the first load to shed Placing 2 switch in the ON position will shed this output next Note that an...

Page 6: ...locks out the sequencing function for channels 6 7 8 9 and 10 Placing the 1 switch in the ON position enables channel 6 instantly not in sequence Placing the 2 switch in the ON position enables channel 7 and so forth This sequencing lockout control has no effect on the load shedding operation Any or all the channels that are removed from the sequencer are still controlled by their load shedding pr...

Page 7: ...actory without charge any material or defects which become apparent in normal use within 3 years from the date the equipment was shipped Equipment is to be returned shipping charges prepaid and will be returned after repair shipping charges paid Kussmaul Electronics Company Inc shall have no liability for damages of any kind to associated equipment arising from the installation and or use of the K...

Page 8: ......

Reviews: