background image

Installation Instructions 

Technical Data 

 

 

cRIO PN-Installation-V0.3/12.05.2017 

 

Business Confidential/

 Proprietary 

4  Technical Data  

 

Parameter 

Value 

Functionality 

PROFINET IO Device 
LLDP supported 
SNMP MIB2 Physical Device 
Max. 254 bytes input and 254 bytes output data 
16 PROFINET IO slots supported 
Min. 1 mS cycle time with RT 
Min. 250 uS cycle time with IRT 
Acyclic  communcation  Read/Write  Record  with  max. 
256 Bytes 
Supported  alarm  types:  Process  Alarm,  Diagnostic 
Alarm, Plug Alarm, Pull Alarm  

PN IO Conformance classes 

NRT, RT, IRT 

Processor 

ARM 9 at 150 MHz 

Memory 

32 Mbyte SRAM 
4 Mbyte Flash Type Memory 

SPI Interface 

SPI Slave up to 4 MBit/s 

Ethernet interface 

2 Port PROFINET IO Realtime switch 

Ethernet Connection Format 

8-pin RJ45-female connector 

Ethernet Connection medium 

Twisted  pair  cable  with  a  conductor  cross-section  of 
0,14 mm²..0,22 mm² 

Ethernet Cable  impedance 

100 Ω 

Ethernet Transmission speed 

100 MBit/s 

Ethernet max. network 
segment expansion 

100 m 

Ethernet Function 

100 Base-T(X) 

Power Requirements 

1.7 W Active Mode (Transmitting and Receiving) 

Storage Temperature Range 

-40 °C  

– +85 °C 

Ambient Temperature Range 

0 °C  

– +50 °C 

Table 3: Technical Data 

 

4.1 Use in hazardous locations 

The module is only suitable for use in 

nonhazardous

 locations.  

PROFINET IO with 100 MBit/s may not be used in hazardous locations. 

Summary of Contents for cRIO PN C Series

Page 1: ...cRIO PN Installation V0 3 12 05 2017 cRIO PN C SERIES Module for PROFINET IO Slave Installation Instructions V0 3 12 05 2017...

Page 2: ...GmbH Business Confidential KUNBUS Proprietary This document includes data that shall not be duplicated used or disclosed in whole or in part for any purpose other than to evaluate this document If ho...

Page 3: ...ness Confidential KUNBUS Proprietary Contents 1 Safety information 1 2 Installation of the Module 2 3 LEDs and Connectors 3 3 1 Position of LEDs and Connectors 3 3 2 LED s 4 3 3 Power connector 4 4 Te...

Page 4: ...Contents Installation Instructions ii cRIO PN Installation V0 3 12 05 2017 KUNBUS Business Confidential KUNBUS Proprietary List of Figures Figure 1 cRIO PN module 2 Figure 2 LEDs and connectors 3...

Page 5: ...tion Instructions Contents cRIO PN Installation V0 3 12 05 2017 iii Business Confidential KUNBUS Proprietary List of Tables Table 1 Meaning of the LEDs 4 Table 2 Power requirements 4 Table 3 Technical...

Page 6: ...Contents Installation Instructions iv cRIO PN Installation V0 3 12 05 2017 KUNBUS Business Confidential KUNBUS Proprietary Blank page...

Page 7: ...NG The cRIO PN is designed exclusively for PELV operation according to EN 60950 EN 60204 VDE 0805 1 Only protective extra low voltages according to the defined standards may be used to supply Shieldin...

Page 8: ...ch adjustments are necessary To mount the module in the CompactRIO system please proceed as follows Switch off the CompactRIO system Plug the cRIO PN module into slot 1 until it snaps in Pay attention...

Page 9: ...onnectors 3 1 Position of LEDs and Connectors Figure 2 LEDs and connectors SPI Activity LED PWR Power indication LED SF System Fault LED BF PROFINET Fail LED Port 1 RJ 45 Profinet IO Realtime switch E...

Page 10: ...No system fault active ON System fault active Possible reasons SPI bus failure PROFINET Alarm active BF Red OFF PROFINET O K ON PROFINET Bus fail Possible reasons Configuration error PROFINET controll...

Page 11: ...Memory 32 Mbyte SRAM 4 Mbyte Flash Type Memory SPI Interface SPI Slave up to 4 MBit s Ethernet interface 2 Port PROFINET IO Realtime switch Ethernet Connection Format 8 pin RJ45 female connector Ethe...

Page 12: ...CE Conformity Declaration Installation Instructions 6 cRIO PN Installation V0 3 12 05 2017 Business Confidential Proprietary 5 CE Conformity Declaration...

Page 13: ...Installation Instructions CE Conformity Declaration cRIO PN Installation V0 3 12 05 2017 7 Business Confidential Proprietary...

Page 14: ...CE Conformity Declaration Installation Instructions 8 cRIO PN Installation V0 3 12 05 2017 Business Confidential Proprietary...

Page 15: ...t ni com patents You can find information about end user license agreements EULAs and third party legal notices in the readme file for your NI product Refer to the Export Compliance Information at ni...

Reviews: