background image

Installation Instructions 

LEDs and Connectors 

 

 

cRIO PN-Installation-V0.3/12.05.2017 

 

Business Confidential/

 Proprietary 

3  LEDs and Connectors 

 

3.1 Position of LEDs and Connectors 

 

 

 

 

 

 

 

Figure 2: LEDs and connectors 

 

SPI

 - Activity LED 

PWR

 - Power indication LED 

SF

 

– System Fault LED 

BF

 - PROFINET Fail LED 

Port 1 

– 

RJ 45

 

Profinet IO 

Realtime switch Ethernet port 1 
 

Power

 

– Power supply connector (plug 

within scope of delivery) 

Port 2 

– 

RJ 45

 

Profinet IO 

Realtime switch Ethernet port 2 

Summary of Contents for cRIO PN C Series

Page 1: ...cRIO PN Installation V0 3 12 05 2017 cRIO PN C SERIES Module for PROFINET IO Slave Installation Instructions V0 3 12 05 2017...

Page 2: ...GmbH Business Confidential KUNBUS Proprietary This document includes data that shall not be duplicated used or disclosed in whole or in part for any purpose other than to evaluate this document If ho...

Page 3: ...ness Confidential KUNBUS Proprietary Contents 1 Safety information 1 2 Installation of the Module 2 3 LEDs and Connectors 3 3 1 Position of LEDs and Connectors 3 3 2 LED s 4 3 3 Power connector 4 4 Te...

Page 4: ...Contents Installation Instructions ii cRIO PN Installation V0 3 12 05 2017 KUNBUS Business Confidential KUNBUS Proprietary List of Figures Figure 1 cRIO PN module 2 Figure 2 LEDs and connectors 3...

Page 5: ...tion Instructions Contents cRIO PN Installation V0 3 12 05 2017 iii Business Confidential KUNBUS Proprietary List of Tables Table 1 Meaning of the LEDs 4 Table 2 Power requirements 4 Table 3 Technical...

Page 6: ...Contents Installation Instructions iv cRIO PN Installation V0 3 12 05 2017 KUNBUS Business Confidential KUNBUS Proprietary Blank page...

Page 7: ...NG The cRIO PN is designed exclusively for PELV operation according to EN 60950 EN 60204 VDE 0805 1 Only protective extra low voltages according to the defined standards may be used to supply Shieldin...

Page 8: ...ch adjustments are necessary To mount the module in the CompactRIO system please proceed as follows Switch off the CompactRIO system Plug the cRIO PN module into slot 1 until it snaps in Pay attention...

Page 9: ...onnectors 3 1 Position of LEDs and Connectors Figure 2 LEDs and connectors SPI Activity LED PWR Power indication LED SF System Fault LED BF PROFINET Fail LED Port 1 RJ 45 Profinet IO Realtime switch E...

Page 10: ...No system fault active ON System fault active Possible reasons SPI bus failure PROFINET Alarm active BF Red OFF PROFINET O K ON PROFINET Bus fail Possible reasons Configuration error PROFINET controll...

Page 11: ...Memory 32 Mbyte SRAM 4 Mbyte Flash Type Memory SPI Interface SPI Slave up to 4 MBit s Ethernet interface 2 Port PROFINET IO Realtime switch Ethernet Connection Format 8 pin RJ45 female connector Ethe...

Page 12: ...CE Conformity Declaration Installation Instructions 6 cRIO PN Installation V0 3 12 05 2017 Business Confidential Proprietary 5 CE Conformity Declaration...

Page 13: ...Installation Instructions CE Conformity Declaration cRIO PN Installation V0 3 12 05 2017 7 Business Confidential Proprietary...

Page 14: ...CE Conformity Declaration Installation Instructions 8 cRIO PN Installation V0 3 12 05 2017 Business Confidential Proprietary...

Page 15: ...t ni com patents You can find information about end user license agreements EULAs and third party legal notices in the readme file for your NI product Refer to the Export Compliance Information at ni...

Reviews: