Installation Instructions
LEDs and Connectors
cRIO PN-Installation-V0.3/12.05.2017
3
Business Confidential/
Proprietary
3 LEDs and Connectors
3.1 Position of LEDs and Connectors
Figure 2: LEDs and connectors
SPI
- Activity LED
PWR
- Power indication LED
SF
– System Fault LED
BF
- PROFINET Fail LED
Port 1
–
RJ 45
Profinet IO
Realtime switch Ethernet port 1
Power
– Power supply connector (plug
within scope of delivery)
Port 2
–
RJ 45
Profinet IO
Realtime switch Ethernet port 2