Putting into service
Shredders
BK
25
$
PUTTING INTO SERVICE
1. Coupling and uncoupling
Description of coupling elements
- A PTO shaft 1 3/8’’ - 6 splines.
- Attachment configuration category 2.
Preparing the tractor
The tractor PTO stub must rotate at a speed of
540 min
-1
(BK 230 / BK 280) or 1000 min
-1
(BK 280 / BK 320).
Hitch pin parallelism
Adjust tractor lift rods so that hitch pins are parallel to the
ground.
The tractor must be fitted with lower link
stabilizers.
Summary of Contents for BK230
Page 1: ...OPERATOR S MANUAL Shredders BK JN009BGB F English 07 2007...
Page 2: ......
Page 22: ...Shredders 20 BK Safety Risk of entanglement 13 Stay clear of rotating drive line...
Page 67: ...Maintenance and storage Shredders BK 65 Reinstall the belt guard 1 Reinstall bolts 2...
Page 70: ...Shredders 68 BK Limited warranty LIMITED WARRANTY...
Page 71: ...Limited warranty Shredders BK 69...
Page 72: ......