Service - 140
RT105M Operator’s Manual
50 Hour
Lube Universal Joints (Initial Service
Lube universal joints (shown) at zerks at 50 hours
initially and every 250 hours thereafter with EPG.
Lube Axle Spindle Pins (Initial
Service)
Lube axle spindle pins (shown) after 50 hours.
initially and every 250 hours thereafter with EPG.
Trencher
Check Trencher Gearbox Oil Level
Check oil at sight tube every 50 hours. Keep oil
level at horizontal line on housing. If necessary,
add MPL at fill plug.
Summary of Contents for RT105M
Page 1: ...RT105M Operator s Manual Issue 2 0 Original Instruction 053 2943...
Page 7: ...Overview 6 RT105M Operator s Manual About This Manual...
Page 25: ...Safety 24 RT105M Operator s Manual Attachment Safety Alerts...
Page 61: ...Controls 60 RT105M Operator s Manual Battery Disconnect...
Page 65: ...Operation Overview 64 RT105M Operator s Manual Leaving Jobsite...
Page 73: ...Prepare 72 RT105M Operator s Manual Check Supplies and Prepare Equipment...
Page 79: ...Drive 78 RT105M Operator s Manual Shut Down...
Page 87: ...Transport 86 RT105M Operator s Manual Retrieve...
Page 95: ...Backhoe 94 RT105M Operator s Manual Finish Job...
Page 96: ...RT105M Operator s Manual Trench 95 Trench Chapter Contents Set Up 96 Operate 98 Finish Job 100...
Page 165: ...Service 164 RT105M Operator s Manual As Needed...
Page 180: ......
Page 181: ......
Page 182: ...RT105M Operator s Manual Service Record 223 Service Record Service Performed Date Hours...
Page 183: ...Service Record 224 RT105M Operator s Manual Service Performed Date Hours...