59
OPERATING THE LOADER
LOADING LOW TRUCKS OR SPREADERS
FROM A PILE
For faster loading, minimize the angle of turn and length
of run between pile and spreader.
Backgrade occasionally with a loaded bucket to keep the
work surface free of ruts and holes. Also, hold the lift
control forward so the full weight of the bucket is scraping
the ground. Use the heel of the bucket
BACKFILLING
Approach the pile with the bucket flat.
Poor operating methods will move less dirt and make it
more difficult to hold a level grade.
A
Do not use the bucket in the dumped position for
bulldozing. As shown above, this method will impose
severe shock loads on the dump-linkage, the bucket
cylinders, and the tractor.
Leave dirt in the bucket because dumping on each pass
wastes time.
Operate at right angles to the ditch. Taking as big a bite
as the tractor can handle.
Leave dirt which drifts over the side of the bucket for final
cleanup.
Pile dirt on the high side for easier backfilling on a slope.
Summary of Contents for L47TL
Page 19: ...9 SAFE OPERATION DANGER WARNING AND CAUTION LABELS OF THE TRACTOR...
Page 20: ...SAFE OPERATION 10...
Page 21: ...11 SAFE OPERATION L47...
Page 22: ...SAFE OPERATION 12 M62...
Page 23: ...13 SAFE OPERATION DANGER WARNING AND CAUTION LABELS OF THE LOADER...
Page 24: ...SAFE OPERATION 14...
Page 26: ......