38
EXCAVATOR OPERATION
A
When the service port is not used for a long period, dirt particles can settle in the lower part of the service port lines.
When the plugs on the service port lines are removed to connect attachments, drain approx. 100 cc (3.4 oz) of oil per
side before making connections.
For hammer choices, contact your dealer.
A
Suppose that the same attachment is mounted on another machine. Even if the same limit setting is made, the same
speed cannot be achieved. Make an optimum setting on each machine.
A
The service port speed fluctuates by getting an attachment relieved at the limited flow volume. Determine the limit level
with combined operations of attachments in mind.
B
One Way Flow Operation (First Service Port)
Summary of Contents for KX080-3
Page 15: ...7 SAFE OPERATION...
Page 16: ...SAFE OPERATION 8...
Page 17: ...9 SAFE OPERATION...
Page 18: ...SAFE OPERATION 10...
Page 19: ...11 SAFE OPERATION...
Page 20: ...SAFE OPERATION 12...
Page 22: ......
Page 115: ...93 LIFTING CAPACITY...