CONTENTS
Observe Following Guidelines when Starting with an Auxiliary Battery.......................... 31
CHECK POINTS AFTER STARTING THE ENGINE ............................................. 32
STOPPING THE ENGINE...................................................................................... 33
RUNNING-IN OF THE NEW EXCAVATOR........................................................... 34
Do not Work with Full Engine Rpm's or Full Loads during the First 50 Working Hours.. 34
Oil Change in the Run-in Stage ...................................................................................... 34
Adjusting the Operator's Seat......................................................................................... 34
Seat Belt ......................................................................................................................... 35
Pivot Turn ....................................................................................................................... 38
Spin Turn ........................................................................................................................ 39
UP AND DOWNHILL DRIVING.............................................................................. 39
PARKING ON A SLOPE ........................................................................................ 40
OPERATION OF THE DOZER .............................................................................. 40
TWO PATTERN SELECTION SYSTEM(TPSS) .................................................... 41
OPERATION OF THE BOOM................................................................................ 42
OPERATION OF THE ARM................................................................................... 42
OPERATION OF THE BUCKET ............................................................................ 43
UNIT SWING AND BOOM SWING OPERATION.................................................. 43
Unit Swing Operation...................................................................................................... 43
Boom Swing Operation................................................................................................... 44
Selecting the Action Modes ............................................................................................ 45
AUX Port Handling Procedure ........................................................................................ 46
Setting the Maximum Flow Volume ................................................................................ 48
HOW TO RELEASE PRESSURE TRAPPED IN THE HYDRAULIC SYSTEM...... 53
1-way or 2-way CIRCUIT SELECTION VALVE OPERATION ............................... 54
AUTO IDLE (AI) OPERATION ............................................................................... 55
IMPORTANT INFORMATION ON EXCAVATOR OPERATION ............................ 55
TRANSPORTING THE EXCAVATOR ON A VEHICLE............................................. 56
MAINTENANCE INTERVALS ................................................................................ 60
OPENING AND CLOSING OF PARTS.................................................................. 63
Opening/Closing of the Engine Hood ............................................................................. 63
Opening/Closing of the Side Cover ................................................................................ 63
Where to store the Tool .................................................................................................. 64
Where to store the Grease Gun...................................................................................... 64
Summary of Contents for KX057-4
Page 1: ......
Page 15: ...7 SAFE OPERATION 6 DANGER WARNING AND CAUTION LABELS...
Page 16: ...SAFE OPERATION 8...
Page 17: ...9 SAFE OPERATION...
Page 18: ...SAFE OPERATION 10...
Page 19: ...11 SAFE OPERATION...
Page 20: ...SAFE OPERATION 12...
Page 22: ......
Page 74: ...52 EXCAVATOR OPERATION...
Page 122: ...100 LIFTING CAPACITY...
Page 123: ...101 LIFTING CAPACITY...
Page 124: ...102 LIFTING CAPACITY...
Page 125: ...103 LIFTING CAPACITY...
Page 126: ...104 LIFTING CAPACITY...
Page 127: ...105 LIFTING CAPACITY...
Page 128: ...106 LIFTING CAPACITY...
Page 129: ...107 LIFTING CAPACITY...