12
SERVICE WORK ON THE CHASSIS
51
C00906-11
–
Mount and tighten screws
on both sides.
Guideline
Screw, fuel tank
M8
15 Nm
(11.1 lbf ft)
Loctite
®
243™
–
Mount and tighten screw
.
Guideline
Remaining screws, chassis
M6
10 Nm (7.4 lbf ft)
–
Mount the fuel tank breather.
Finishing work
–
Lock the seat. (
12.30
Checking for chain dirt accumulation
400678-01
–
Check the chain for coarse dirt accumulation.
» If the chain is very dirty:
–
Clean the chain. (
12.31
Cleaning the chain
Warning
Danger of accidents
Oil or grease on the tires reduces their grip.
–
Remove oil and grease with a suitable cleaning material.
Warning
Danger of accidents
Reduced braking efficiency due to oil or grease on the brake discs.
–
Always keep the brake discs free of oil and grease, and clean them with brake cleaner when necessary.
Warning
Environmental hazard
Hazardous substances cause environmental damage.
–
Oil, grease, filters, fuel, cleaners, brake fluid, etc., should be disposed of as stipulated in applicable regulations.
Info
The service life of the chain depends largely on its maintenance.
Preparatory work
–
Raise the motorcycle with the lift stand. (
400725-01
Main work
–
Clean the chain regularly and then treat with chain spray.
Chain cleaner (
Off-road chain spray (
Finishing work
–
Remove the motorcycle from the lift stand. (