2 SETUP
6
S01841-10
Main work
–
Remove the adhesive tape in the upper area of the motorcycle.
S01842-10
–
Roll down the film at the sides.
Info
To avoid damaging the motorcycle during unpacking,
leave the other films on the vehicle until you have fin-
ished work on the vehicle.
–
Remove the separate enclosure and unpack it. Check that the
scope of supply is complete using the enclosed packing list.
Info
The procedure in the event of missing parts is
described in the customer service manual.
–
Check the vehicle for transport damage.