4.11 Loopback Test
This menu is used to start a loopback test operation with the link partner unit over the fiber link. The message
displayed during test is:
The result message displayed after a test finished is:
The test result is also displayed on LEDs - LBT and LBR.
4.12 Reboot System
This menu is used to reboot the device unit remotely with current configuration. Starting this menu will make
your current http connection lost. You must rebuild the connection to perform any management operation to
the unit.
4.13 Restore Default
-43-